Waterford 3

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 2208.0 1464.3 2159.0 2184.0 2208.0 1878.8 2183.0 1349.8
                 
Indicator value 0.8 0 0 0 0 0 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 0 0 0 0 0 1.0
Critical hours 2208.0 1464.3 2159.0 2184.0 2208.0 1878.8 2183.0 1349.8
                 
Indicator value 0 0 0 0 0 0 0 0.9

Licensee Comments:

2Q/08: During power ascension following Refuel Outage 15, the unit was shutdown to repair a steam leak from a test connection on the Main Turbine. The leak was repaired within five hours and the power ascension was resumed.






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 2.10E-07 2.10E-07 2.70E-07 2.70E-07 1.90E-07 1.60E-07 -1.40E-07 -1.50E-07
URI (ΔCDF) -1.30E-06 -1.40E-06 -1.40E-06 -1.40E-06 -1.30E-06 -1.30E-06 -1.40E-06 -2.00E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.09E-06 -1.19E-06 -1.13E-06 -1.13E-06 -1.11E-06 -1.14E-06 -1.54E-06 -2.15E-06

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 7.30E-08 7.30E-08 7.30E-08 5.80E-08 -4.40E-09 -1.40E-08 -6.30E-09 -8.00E-09
URI (ΔCDF) 8.80E-08 8.70E-08 8.70E-08 8.80E-08 -1.50E-07 -1.40E-07 -1.40E-07 -1.50E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.61E-07 1.60E-07 1.60E-07 1.46E-07 -1.54E-07 -1.54E-07 -1.46E-07 -1.58E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -6.10E-08 -6.10E-08 -3.70E-08 -6.30E-08 -6.30E-08 -4.40E-08 -2.20E-08 -2.40E-08
URI (ΔCDF) -2.80E-07 -2.80E-07 -2.80E-07 -2.80E-07 -2.80E-07 -2.80E-07 -2.80E-07 -2.80E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.41E-07 -3.41E-07 -3.17E-07 -3.43E-07 -3.43E-07 -3.24E-07 -3.02E-07 -3.04E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 6.10E-12 5.70E-12 4.20E-12 2.80E-12 -2.80E-12 -2.80E-12 -2.80E-12 -2.80E-12
URI (ΔCDF) 2.00E-11 2.00E-11 2.00E-11 2.00E-11 -5.10E-12 -5.20E-12 -5.10E-12 -5.20E-12
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.61E-11 2.57E-11 2.42E-11 2.28E-11 -7.90E-12 -8.00E-12 -7.90E-12 -8.00E-12

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 6.40E-08 6.40E-08 6.40E-08 6.40E-08 6.30E-08 6.40E-08 6.50E-08 6.40E-08
URI (ΔCDF) 6.30E-09 -2.30E-08 -2.40E-08 -3.60E-08 -4.60E-08 -4.50E-08 -2.00E-08 -2.10E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 7.03E-08 4.10E-08 4.00E-08 2.80E-08 1.70E-08 1.90E-08 4.50E-08 4.30E-08

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.002050 0.002010 0.002190 0.002090 0.002150 N/A 0.001700 0.001210 0.001060 0.001230 0.001180 0.001870
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.2 0.2 0.2 N/A 0.2 0.1 0.1 0.1 0.1 0.2
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.001900 0.001990 0.002500 0.006940 0.001690 0.002050 0.002460 0.002220 0.001910 0.004460 N/A 0.000925
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.3 0.7 0.2 0.2 0.2 0.2 0.2 0.4 N/A 0.1

Licensee Comments:

6/08: The Reactor was shutdown for the entire month of May 2008 to conduct planned Refueling Outage 15.






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 0.136 0.150 0.140 0.130 0.130 0.396 0.030 0.020 0.020 0.030 0.040 0.040
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.4 1.5 1.4 1.3 1.3 4.0 0.3 0.2 0.2 0.3 0.4 0.4
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 0.038 0.040 0.030 0.040 0.030 0.030 0.030 0.030 0.030 0.030 N/A 0.060
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.4 0.4 0.3 0.4 0.3 0.3 0.3 0.3 0.3 0.3 N/A 0.6

Licensee Comments:

6/08: The Reactor was shutdown for the entire month of May 2008 to conduct planned Refueling Outage 15.






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 67.0 12.0 25.0 28.0 26.0 20.0 37.0 8.0
Total opportunities 68.0 12.0 26.0 28.0 28.0 20.0 38.0 8.0
                 
Indicator value 96.5% 96.5% 96.1% 96.5% 96.2% 96.6% 96.6% 97.8%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 125.0 125.0 123.0 122.0 123.0 120.0 126.0 112.0
Total Key personnel 126.0 129.0 136.0 132.0 131.0 123.0 133.0 121.0
                 
Indicator value 99.2% 96.9% 90.4% 92.4% 93.9% 97.6% 94.7% 92.6%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 431 431 432 431 432 432 432 431
Total sirens-tests 432 432 432 432 432 432 432 432
                 
Indicator value 99.9% 99.9% 99.9% 99.8% 99.9% 99.9% 99.9% 99.9%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 