skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Point Beach 2

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 2208.0 1445.2 2159.0 2184.0 2208.0 2209.0 2183.0 1383.2
                 
Indicator value 0 0 0 0 0 0 0 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 0 0 1.0 1.0 0 0
Critical hours 2208.0 1445.2 2159.0 2184.0 2208.0 2209.0 2183.0 1383.2
                 
Indicator value 0 0 0 0 0.9 1.6 1.6 1.8

Licensee Comments:

4Q/07: CAP01124161 tracks station review of the December 12-13, 2007 Power Change Greater than 20% (reviewing planned vs. unplanned).






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 1 0 0 1 0 0 0 0
                 
Indicator value 2 2 1 2 1 1 1 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 4.00E-07 5.80E-07 7.20E-07 7.10E-07 5.40E-07 5.20E-07 5.40E-07 1.30E-06
URI (ΔCDF) -1.10E-06 -8.80E-07 -8.80E-07 -8.80E-07 -8.80E-07 -8.80E-07 -9.10E-07 -1.70E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -7.00E-07 -3.00E-07 -1.60E-07 -1.70E-07 -3.40E-07 -3.60E-07 -3.70E-07 -4.00E-07

Licensee Comments:

2Q/08: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.60E-09 -1.90E-09 -1.90E-09 -1.90E-09 2.80E-08 2.70E-08 2.10E-08 9.70E-10
URI (ΔCDF) 2.50E-07 2.50E-07 2.50E-07 2.50E-07 2.50E-07 2.50E-07 2.50E-07 1.90E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 2.48E-07 2.48E-07 2.48E-07 2.48E-07 2.78E-07 2.77E-07 2.71E-07 1.91E-07

Licensee Comments:

2Q/08: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 5.10E-07 4.30E-07 3.10E-07 1.40E-07 6.40E-07 8.80E-07 8.60E-07 4.40E-07
URI (ΔCDF) -1.10E-06 -1.10E-06 -1.10E-06 -1.10E-06 -1.10E-06 -1.10E-06 -1.10E-06 -7.50E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -5.90E-07 -6.70E-07 -7.90E-07 -9.60E-07 -4.60E-07 -2.20E-07 -2.40E-07 -3.10E-07

Licensee Comments:

2Q/08: Changed PRA Parameter(s). In 1Q08, the November 2007 2P29 event was reported as a failure in the Data Review Notes, but not in the database (see AR01128114). If it had been input as a failure, the system color would have remained green with the risk cap invoked and and MSPI of 2.9e-07. This event has since been determined to not be a failure and the failure record has been updated to reflect this. The unavailability hours for November have been changed to planned.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 4.30E-08 3.60E-08 2.60E-09 2.60E-08 9.60E-08 1.00E-07 8.20E-08 4.60E-08
URI (ΔCDF) -5.20E-08 -5.20E-08 -5.20E-08 -5.20E-08 -4.70E-08 -4.70E-08 -4.70E-08 -3.90E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -9.00E-09 -1.60E-08 -4.94E-08 -2.60E-08 4.90E-08 5.30E-08 3.50E-08 7.00E-09

Licensee Comments:

2Q/08: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 4.00E-07 3.30E-07 -2.90E-07 -2.90E-07 -3.30E-07 -9.90E-08 -3.20E-07 -7.80E-07
URI (ΔCDF) -1.50E-06 -2.00E-06 -2.00E-06 -2.00E-06 -1.10E-06 -1.10E-06 -1.10E-06 -1.10E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.10E-06 -1.67E-06 -2.29E-06 -2.29E-06 -1.43E-06 -1.20E-06 -1.42E-06 -1.88E-06

Licensee Comments:

2Q/08: Changed PRA Parameter(s). Unavailability for SW discharge to Unit 2 for March 2008 was updated. See AR01128197.






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.000312 0.000321 0.000337 0.000342 0.000199 0.000204 0.000212 0.000216 0.000232 0.000246 0.000256 0.000291
Technical specification limit 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000304 0.000289 0.000289 0.000366 0.000303 0.000306 0.000327 0.000393 0.000344 0.000344 0.000178 0.000181
Technical specification limit 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments:

3/08: Changed entry from 0.00327 to actual value of 0.000327 for January 2008 (data entry error from scientific format to decimal entry). Correction of data was made on 04/29/08 and is documented in CAP01126993.






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 0.054 0.060 0.070 0.060 0.060 0.080 0.020 0.028 0.044 0.110 0.120 0.030
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.5 0.6 0.7 0.6 0.6 0.8 0.2 0.3 0.4 1.1 1.2 0.3
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 0.030 0.090 0.150 0.070 0.110 0.050 0.030 0.010 0.050 0.050 0.010 0.004
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 0.3 0.9 1.5 0.7 1.1 0.5 0.3 0.1 0.5 0.5 0.1 0

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 37.0 24.0 49.0 22.0 33.0 3.0 23.0 24.0
Total opportunities 38.0 24.0 50.0 22.0 36.0 3.0 24.0 24.0
                 
Indicator value 95.1% 96.1% 97.6% 98.4% 97.9% 98.0% 97.5% 97.3%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 63.0 63.0 58.0 57.0 58.0 59.0 56.0 56.0
Total Key personnel 63.0 63.0 58.0 57.0 58.0 59.0 56.0 56.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 84 83 83 83 83 82 82 84
Total sirens-tests 84 84 84 84 84 84 84 84
                 
Indicator value 99.7% 99.4% 99.1% 99.1% 98.8% 98.5% 98.2% 98.5%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 1 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 1 1 1 1 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: August 4, 2008