skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Oyster Creek

2Q/2008 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 0 1.0 1.0 0 1.0
Critical hours 2208.0 1581.3 2159.0 2075.0 2092.2 2183.9 2183.0 2120.7
                 
Indicator value 0 0 0 0 0.9 1.6 1.6 2.4


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 1.0 0 0 0 2.0 1.0 1.0 0
Critical hours 2208.0 1581.3 2159.0 2075.0 2092.2 2183.9 2183.0 2120.7
                 
Indicator value 4.1 4.5 1.7 0.9 1.8 2.5 3.3 3.3

Licensee Comments:

3Q/07: Revised August 9, 2008, downpower to "unplanned power change" due to error in data input regarding reason for downpower. PI color remains GREEN for the affected period.






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 1.0 0 0 0
                 
                 
Indicator value         1.0 1.0 1.0 1.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 1 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -1.80E-07 -1.70E-07 -1.70E-07 -2.90E-07 -2.90E-07 -1.50E-07 -9.40E-08 -2.90E-07
URI (ΔCDF) -1.70E-06 -1.70E-06 -1.70E-06 -1.70E-06 -1.70E-06 -1.70E-06 -1.80E-06 -1.80E-06
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.88E-06 -1.87E-06 -1.87E-06 -1.99E-06 -1.99E-06 -1.85E-06 -1.89E-06 -2.09E-06

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) -2.80E-08 -2.80E-08 -2.80E-08 -2.70E-08 -2.70E-08 -2.60E-08 -2.50E-08 -2.70E-08
URI (ΔCDF) -4.30E-09 -4.20E-09 -4.10E-09 -3.80E-09 -3.80E-09 -3.70E-09 -3.60E-09 -3.30E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.23E-08 -3.22E-08 -3.21E-08 -3.08E-08 -3.08E-08 -2.97E-08 -2.86E-08 -3.03E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 3.00E-09 3.50E-09 3.50E-09 3.50E-09 3.50E-09 -1.20E-09 -1.20E-09 -1.00E-09
URI (ΔCDF) 7.40E-09 7.40E-09 7.40E-09 7.40E-09 7.20E-09 -1.00E-10 -1.00E-10 -1.10E-10
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.04E-08 1.09E-08 1.09E-08 1.09E-08 1.07E-08 -1.30E-09 -1.30E-09 -1.11E-09

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 1.50E-08 1.20E-08 1.90E-08 1.50E-08 1.40E-08 -1.00E-08 9.70E-09 1.90E-08
URI (ΔCDF) -4.30E-10 -4.30E-10 -4.30E-10 -4.30E-10 -4.30E-10 -4.30E-10 -4.30E-10 -4.40E-10
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.46E-08 1.16E-08 1.86E-08 1.46E-08 1.36E-08 -1.04E-08 9.27E-09 1.86E-08

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF) 1.30E-08 9.90E-09 9.30E-09 5.70E-09 3.10E-09 -1.40E-08 -1.10E-08 -1.10E-08
URI (ΔCDF) -4.20E-10 -4.20E-10 -4.30E-10 -4.30E-10 -4.30E-10 -4.40E-10 -4.40E-10 -4.50E-10
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.26E-08 9.48E-09 8.87E-09 5.27E-09 2.67E-09 -1.44E-08 -1.14E-08 -1.15E-08

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity 0.000042 0.000053 0.000045 0.000040 0.000016 0.000020 0.000021 0.000021 0.000018 0.000017 0.000018 0.000019
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000016 0.000014 0.000013 0.000012 0.000015 0.000012 0.000014 0.000013 0.000014 0.000014 0.000017 0.000016
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage 4.750 4.870 4.890 4.880 4.880 4.910 4.910 4.750 4.800 4.800 4.880 4.990
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 19.0 19.5 19.6 19.5 19.5 19.6 19.6 19.0 19.2 19.2 19.5 20.0
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 5.640 5.730 5.630 5.530 5.470 5.520 5.470 5.380 6.300 5.410 5.870 5.960
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 22.6 22.9 22.5 22.1 21.9 22.1 21.9 21.5 25.2 21.6 23.5 23.8

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 29.0 42.0 44.0 87.0 23.0 46.0 9.0 40.0
Total opportunities 30.0 42.0 44.0 88.0 24.0 48.0 9.0 40.0
                 
Indicator value 95.3% 95.9% 96.2% 96.8% 97.2% 97.4% 97.7% 98.5%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 47.0 50.0 51.0 46.0 48.0 48.0 53.0 49.0
Total Key personnel 47.0 51.0 51.0 46.0 48.0 50.0 54.0 50.0
                 
Indicator value 100.0% 98.0% 100.0% 100.0% 100.0% 96.0% 98.1% 98.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 538 543 543 546 537 545 545 545
Total sirens-tests 546 546 546 546 546 546 546 546
                 
Indicator value 99.4% 99.3% 99.3% 99.4% 99.3% 99.4% 99.5% 99.5%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 1 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 1 2 2 1 1 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: August 4, 2008