Licensee's General Comments: none
Unplanned Scrams per 7000 Critical Hrs | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Unplanned scrams | 2.0 | 0 | 0 | 2.0 | 0 | 0 | 0 | 0 |
Critical hours | 2166.7 | 2209.0 | 1594.1 | 1712.6 | 2208.0 | 2209.0 | 2183.0 | 2184.0 |
Indicator value | 1.6 | 1.6 | 1.7 | 3.6 | 1.8 | 1.8 | 1.7 | 0 |
Licensee Comments: none
Unplanned Power Changes per 7000 Critical Hrs | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Unplanned power changes | 0 | 0 | 0 | 1.0 | 0 | 0 | 0 | 0 |
Critical hours | 2166.7 | 2209.0 | 1594.1 | 1712.6 | 2208.0 | 2209.0 | 2183.0 | 2184.0 |
Indicator value | 0 | 0 | 0 | 0.9 | 0.9 | 0.9 | 0.8 | 0 |
Licensee Comments: none
Unplanned Scrams with Complications | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Scrams with complications | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Indicator value | 0.0 | 0.0 | 0.0 | 0.0 |
Licensee Comments: none
Safety System Functional Failures (PWR) | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Safety System Functional Failures | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 1 |
Licensee Comments:
2Q/08: LER-2008-002 reported on April 18, 2008, a SSFF due to a loss of the 31 Pressurizer Backup Heater used to meet Tech Spec 3.3.4 Alternate Safe Shutdown. The TS references the FSAR which only credits the 31 Pressurizer Backup Heater for shutdown outside the control room for non-mechanistic events. The 32 and 33 Pressurizer Backup Heaters were operable and available per procedure but per NRC judgment the other pressurizer backup heaters could not be credited as they were not considered part of the license basis. The 31 Pressurizer Backup Heater as listed in TS 3.3.4 is a single train system not credited in the safety analysis but used to support safe shutdown of the plant remote from the control room for non-mechanistic events.
Mitigating Systems Performance Index, Emergency AC Power System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | 2.50E-09 | 3.00E-08 | 3.60E-08 | 4.70E-08 | 5.30E-08 | 5.60E-08 | 6.50E-08 | 5.70E-08 |
URI (ΔCDF) | -2.90E-07 | -2.80E-07 | -3.00E-07 | -3.00E-07 | -3.00E-07 | -3.00E-07 | -2.90E-07 | -2.90E-07 |
PLE | NO | NO | NO | NO | NO | NO | NO | NO |
Indicator value | -2.88E-07 | -2.50E-07 | -2.64E-07 | -2.53E-07 | -2.47E-07 | -2.44E-07 | -2.25E-07 | -2.33E-07 |
Licensee Comments: none
Mitigating Systems Performance Index, High Pressure Injection System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -3.10E-10 | -2.20E-10 | -2.10E-10 | 2.20E-10 | 1.30E-10 | 1.60E-10 | 2.10E-10 | 1.50E-10 |
URI (ΔCDF) | -1.10E-09 | -1.20E-09 | -1.30E-09 | -1.30E-09 | -1.30E-09 | -1.30E-09 | 1.80E-09 | 1.70E-09 |
PLE | NO | NO | NO | NO | NO | NO | NO | NO |
Indicator value | -1.41E-09 | -1.42E-09 | -1.51E-09 | -1.08E-09 | -1.17E-09 | -1.14E-09 | 2.01E-09 | 1.85E-09 |
Licensee Comments: none
Mitigating Systems Performance Index, Heat Removal System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -2.30E-09 | -2.00E-08 | -2.50E-08 | -2.30E-08 | 3.20E-10 | -9.60E-09 | -1.60E-08 | -1.70E-08 |
URI (ΔCDF) | -1.70E-07 | -1.60E-07 | -1.90E-07 | -2.20E-07 | -2.30E-07 | -2.20E-07 | -2.20E-07 | -2.20E-07 |
PLE | NO | NO | NO | NO | NO | NO | NO | NO |
Indicator value | -1.72E-07 | -1.80E-07 | -2.15E-07 | -2.43E-07 | -2.30E-07 | -2.30E-07 | -2.36E-07 | -2.37E-07 |
Licensee Comments: none
Mitigating Systems Performance Index, Residual Heat Removal System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -1.20E-08 | -1.20E-08 | -1.20E-08 | -1.10E-08 | -1.10E-08 | -9.20E-09 | -9.30E-09 | -9.30E-09 |
URI (ΔCDF) | -2.50E-09 | -2.40E-09 | -4.10E-09 | -4.20E-09 | -4.20E-09 | -4.00E-09 | -3.90E-09 | -3.90E-09 |
PLE | NO | NO | NO | NO | NO | NO | NO | NO |
Indicator value | -1.45E-08 | -1.44E-08 | -1.61E-08 | -1.52E-08 | -1.52E-08 | -1.32E-08 | -1.32E-08 | -1.32E-08 |
Licensee Comments: none
Mitigating Systems Performance Index, Cooling Water Systems | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | 2.80E-08 | 4.00E-08 | 4.30E-08 | 4.50E-08 | 4.50E-08 | 7.50E-08 | 7.10E-08 | 6.10E-08 |
URI (ΔCDF) | -1.30E-08 | -1.30E-08 | -1.40E-08 | -1.40E-08 | -1.40E-08 | 2.40E-08 | 2.50E-08 | 2.50E-08 |
PLE | NO | NO | NO | NO | NO | NO | NO | NO |
Indicator value | 1.50E-08 | 2.70E-08 | 2.90E-08 | 3.10E-08 | 3.10E-08 | 9.90E-08 | 9.60E-08 | 8.60E-08 |
Licensee Comments: none
Reactor Coolant System Activity | 7/06 | 8/06 | 9/06 | 10/06 | 11/06 | 12/06 | 1/07 | 2/07 | 3/07 | 4/07 | 5/07 | 6/07 |
Maximum activity | 0.000306 | 0.000329 | 0.000336 | 0.000327 | 0.000326 | 0.000326 | 0.000332 | 0.000334 | 0.000336 | 0.000153 | 0.000164 | 0.000281 |
Technical specification limit | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Reactor Coolant System Activity | 7/07 | 8/07 | 9/07 | 10/07 | 11/07 | 12/07 | 1/08 | 2/08 | 3/08 | 4/08 | 5/08 | 6/08 |
Maximum activity | 0.000237 | 0.000169 | 0.000173 | 0.000168 | 0.000185 | 0.000170 | 0.000157 | 0.000172 | 0.000197 | 0.000216 | 0.000397 | 0.000227 |
Technical specification limit | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none
Reactor Coolant System Leakage | 7/06 | 8/06 | 9/06 | 10/06 | 11/06 | 12/06 | 1/07 | 2/07 | 3/07 | 4/07 | 5/07 | 6/07 |
Maximum leakage | 0.030 | 0.050 | 0.060 | 0.070 | 0.070 | 0.010 | 0.010 | 0.020 | 0.010 | 0.020 | 0.020 | 0.030 |
Technical specification limit | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 |
Indicator value | 0.3 | 0.5 | 0.6 | 0.7 | 0.7 | 0.1 | 0.1 | 0.2 | 0.1 | 0.2 | 0.2 | 0.3 |
Reactor Coolant System Leakage | 7/07 | 8/07 | 9/07 | 10/07 | 11/07 | 12/07 | 1/08 | 2/08 | 3/08 | 4/08 | 5/08 | 6/08 |
Maximum leakage | 0.030 | 0.030 | 0.020 | 0.030 | 0.030 | 0.020 | 0.030 | 0.020 | 0.030 | 0.020 | 0.020 | 0.030 |
Technical specification limit | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 |
Indicator value | 0.3 | 0.3 | 0.2 | 0.3 | 0.3 | 0.2 | 0.3 | 0.2 | 0.3 | 0.2 | 0.2 | 0.3 |
Licensee Comments: none
Drill/Exercise Performance | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Successful opportunities | 73.0 | 11.0 | 19.0 | 57.0 | 72.0 | 66.0 | 28.0 | 50.0 |
Total opportunities | 73.0 | 14.0 | 20.0 | 58.0 | 75.0 | 71.0 | 28.0 | 54.0 |
Indicator value | 97.1% | 95.9% | 95.5% | 96.3% | 96.5% | 96.3% | 96.5% | 95.7% |
Licensee Comments: none
ERO Drill Participation | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Participating Key personnel | 104.0 | 104.0 | 106.0 | 114.0 | 113.0 | 111.0 | 114.0 | 99.0 |
Total Key personnel | 106.0 | 108.0 | 108.0 | 117.0 | 116.0 | 111.0 | 114.0 | 99.0 |
Indicator value | 98.1% | 96.3% | 98.1% | 97.4% | 97.4% | 100.0% | 100.0% | 100.0% |
Licensee Comments: none
Alert & Notification System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Successful siren-tests | 882 | 885 | 728 | 965 | 536 | 618 | 786 | 627 |
Total sirens-tests | 888 | 888 | 732 | 974 | 540 | 625 | 793 | 637 |
Indicator value | 98.5% | 98.9% | 99.4% | 99.4% | 99.4% | 99.2% | 99.1% | 98.9% |
Licensee Comments: none
Occupational Exposure Control Effectiveness | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
High radiation area occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Very high radiation area occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unintended exposure occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Indicator value | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none
RETS/ODCM Radiological Effluent | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
RETS/ODCM occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none