Licensee's General Comments: none
Unplanned Scrams per 7000 Critical Hrs | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Unplanned scrams | 0 | 0 | 0 | 2.0 | 2.0 | 1.0 | 0 | 0 |
Critical hours | 0 | 0 | 0 | 773.5 | 2137.5 | 1877.4 | 2183.0 | 2184.0 |
Indicator value | N/A | N/A | N/A | N/A | 9.6 | 7.3 | 5.0 | 2.5 |
Licensee Comments: none
Unplanned Power Changes per 7000 Critical Hrs | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Unplanned power changes | 0 | 0 | 0 | 0 | 1.0 | 1.0 | 0 | 0 |
Critical hours | 0 | 0 | 0 | 773.5 | 2137.5 | 1877.4 | 2183.0 | 2184.0 |
Indicator value | N/A | N/A | N/A | N/A | 2.4 | 2.9 | 2.0 | 1.7 |
Licensee Comments: none
Unplanned Scrams with Complications | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Scrams with complications | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
Indicator value | 0.0 | 0.0 | 0.0 | 0.0 |
Licensee Comments:
3Q/07: On 9/16/07, U1- Received annunciator 1-XA-55-6A, window 17, C3 Heater Level High and observed 1C3 extraction isolation valve, 1-FCV- 5-64, going closed. Indicated 1C3 Heater level on ICS was approximately 42 inches with the drain valve having a full open demand. Followed actions of ARP & 1-AOI-6-1B, LOW PRESSURE FEEDWATER HEATER STRING/EXTRACTION ISOLATION.
Safety System Functional Failures (BWR) | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Safety System Functional Failures | 0 | 0 | 0 | 0 | 0 | |||
Indicator value | 0 | 0 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Mitigating Systems Performance Index, Emergency AC Power System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -4.90E-09 | -4.90E-09 | -4.90E-09 | -3.80E-09 | 2.30E-09 | |||
URI (ΔCDF) | -5.80E-08 | -5.80E-08 | -5.80E-08 | -4.30E-08 | -4.30E-08 | |||
PLE | N/A | N/A | N/A | NO | NO | NO | NO | NO |
Indicator value | -6.29E-08 | -6.29E-08 | -6.29E-08 | -4.68E-08 | -4.07E-08 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
1Q/08: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
4Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
3Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time-averaged indices.
2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Mitigating Systems Performance Index, High Pressure Injection System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | 1.10E-06 | 6.40E-07 | 3.60E-07 | 2.40E-07 | 4.40E-07 | |||
URI (ΔCDF) | -5.60E-08 | -1.40E-07 | -2.20E-07 | -2.90E-07 | -3.90E-07 | |||
PLE | N/A | N/A | N/A | NO | NO | NO | NO | NO |
Indicator value | 1.04E-06 | 5.00E-07 | 1.40E-07 | -5.00E-08 | 5.00E-08 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.
2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Mitigating Systems Performance Index, Heat Removal System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -7.50E-09 | 2.40E-07 | 1.20E-07 | 4.40E-08 | 5.10E-08 | |||
URI (ΔCDF) | -5.20E-09 | -1.20E-08 | -1.90E-08 | -2.60E-08 | -3.20E-08 | |||
PLE | N/A | N/A | N/A | NO | NO | NO | NO | NO |
Indicator value | -1.27E-08 | 2.28E-07 | 1.01E-07 | 1.80E-08 | 1.90E-08 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.
2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Mitigating Systems Performance Index, Residual Heat Removal System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -6.50E-08 | -6.50E-08 | 1.00E-07 | 2.00E-08 | -8.90E-09 | |||
URI (ΔCDF) | -4.50E-08 | -5.00E-08 | -5.40E-08 | -5.60E-08 | -5.90E-08 | |||
PLE | N/A | N/A | N/A | NO | NO | NO | NO | NO |
Indicator value | -1.10E-07 | -1.15E-07 | 4.60E-08 | -3.60E-08 | -6.79E-08 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.
2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Mitigating Systems Performance Index, Cooling Water Systems | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
UAI (ΔCDF) | -8.20E-09 | 4.90E-08 | 2.50E-08 | 1.30E-08 | 1.50E-08 | |||
URI (ΔCDF) | -1.00E-07 | -1.00E-07 | -1.00E-07 | -1.00E-07 | -1.00E-07 | |||
PLE | N/A | N/A | N/A | NO | NO | NO | NO | NO |
Indicator value | -1.08E-07 | -5.10E-08 | -7.50E-08 | -8.70E-08 | -8.50E-08 |
Licensee Comments:
2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.
1Q/08: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
4Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.
3Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices will be calculated and reported when sufficent quarterly data has been entered to support valid calculation of time-averaged indices.
2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.
Reactor Coolant System Activity | 7/06 | 8/06 | 9/06 | 10/06 | 11/06 | 12/06 | 1/07 | 2/07 | 3/07 | 4/07 | 5/07 | 6/07 |
Maximum activity | N/A | 0.000119 | ||||||||||
Technical specification limit | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 3.2 | 3.2 |
Indicator value | N/A | 0 |
Reactor Coolant System Activity | 7/07 | 8/07 | 9/07 | 10/07 | 11/07 | 12/07 | 1/08 | 2/08 | 3/08 | 4/08 | 5/08 | 6/08 |
Maximum activity | 0.000133 | 0.000108 | 0.000083 | 0.000078 | 0.000081 | 0.000119 | 0.000099 | 0.000094 | 0.000081 | 0.000085 | 0.000045 | 0.000049 |
Technical specification limit | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 | 3.2 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none
Reactor Coolant System Leakage | 7/06 | 8/06 | 9/06 | 10/06 | 11/06 | 12/06 | 1/07 | 2/07 | 3/07 | 4/07 | 5/07 | 6/07 |
Maximum leakage | 1.900 | 2.080 | ||||||||||
Technical specification limit | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 30.0 | 30.0 | |
Indicator value | 6.3 | 6.9 |
Reactor Coolant System Leakage | 7/07 | 8/07 | 9/07 | 10/07 | 11/07 | 12/07 | 1/08 | 2/08 | 3/08 | 4/08 | 5/08 | 6/08 |
Maximum leakage | 2.430 | 2.260 | 2.330 | 2.560 | 2.530 | 2.790 | 3.880 | 2.670 | 2.760 | 2.770 | 2.890 | 3.110 |
Technical specification limit | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 | 30.0 |
Indicator value | 8.1 | 7.5 | 7.8 | 8.5 | 8.4 | 9.3 | 12.9 | 8.9 | 9.2 | 9.2 | 9.6 | 10.4 |
Licensee Comments: none
Drill/Exercise Performance | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Successful opportunities | 44.0 | 24.0 | 0 | 7.0 | 8.0 | 55.0 | 6.0 | 3.0 |
Total opportunities | 44.0 | 24.0 | 0 | 8.0 | 8.0 | 56.0 | 6.0 | 3.0 |
Indicator value | 98.9% | 98.9% | 98.3% | 98.3% | 98.1% | 98.1% | 98.7% |
Licensee Comments: none
ERO Drill Participation | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Participating Key personnel | 69.0 | 68.0 | 63.0 | 66.0 | 66.0 | 68.0 | 62.0 | 56.0 |
Total Key personnel | 69.0 | 68.0 | 65.0 | 67.0 | 67.0 | 68.0 | 64.0 | 61.0 |
Indicator value | 100.0% | 100.0% | 96.9% | 98.5% | 98.5% | 100.0% | 96.9% | 91.8% |
Licensee Comments: none
Alert & Notification System | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
Successful siren-tests | 793 | 798 | 797 | 795 | 798 | 698 | 999 | 596 |
Total sirens-tests | 800 | 800 | 800 | 800 | 800 | 700 | 1000 | 600 |
Indicator value | 99.6% | 99.6% | 99.5% | 99.5% | 99.6% | 99.6% | 99.7% | 99.7% |
Licensee Comments: none
Occupational Exposure Control Effectiveness | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
High radiation area occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Very high radiation area occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Unintended exposure occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none
RETS/ODCM Radiological Effluent | 3Q/06 | 4Q/06 | 1Q/07 | 2Q/07 | 3Q/07 | 4Q/07 | 1Q/08 | 2Q/08 |
RETS/ODCM occurrences | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Indicator value | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Licensee Comments: none