Unplanned Scrams per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned scrams 0 0 0 2.0 2.0 1.0 0 0
Critical hours 0 0 0 773.5 2137.5 1877.4 2183.0 2184.0
                 
Indicator value N/A N/A N/A N/A 9.6 7.3 5.0 2.5


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Unplanned power changes 0 0 0 0 1.0 1.0 0 0
Critical hours 0 0 0 773.5 2137.5 1877.4 2183.0 2184.0
                 
Indicator value N/A N/A N/A N/A 2.4 2.9 2.0 1.7

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Scrams with complications   0 0 0 0 0 0 0
                 
                 
Indicator value         0.0 0.0 0.0 0.0

Licensee Comments:

3Q/07: On 9/16/07, U1- Received annunciator 1-XA-55-6A, window 17, C3 Heater Level High and observed 1C3 extraction isolation valve, 1-FCV- 5-64, going closed. Indicated 1C3 Heater level on ICS was approximately 42 inches with the drain valve having a full open demand. Followed actions of ARP & 1-AOI-6-1B, LOW PRESSURE FEEDWATER HEATER STRING/EXTRACTION ISOLATION.






Link to Notes

Safety System Functional Failures (BWR) 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Safety System Functional Failures       0 0 0 0 0
                 
Indicator value             0 0

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF)       -4.90E-09 -4.90E-09 -4.90E-09 -3.80E-09 2.30E-09
URI (ΔCDF)       -5.80E-08 -5.80E-08 -5.80E-08 -4.30E-08 -4.30E-08
PLE N/A N/A N/A NO NO NO NO NO
                 
Indicator value       -6.29E-08 -6.29E-08 -6.29E-08 -4.68E-08 -4.07E-08

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

1Q/08: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

4Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

3Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time-averaged indices.

2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF)       1.10E-06 6.40E-07 3.60E-07 2.40E-07 4.40E-07
URI (ΔCDF)       -5.60E-08 -1.40E-07 -2.20E-07 -2.90E-07 -3.90E-07
PLE N/A N/A N/A NO NO NO NO NO
                 
Indicator value       1.04E-06 5.00E-07 1.40E-07 -5.00E-08 5.00E-08

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.

2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF)       -7.50E-09 2.40E-07 1.20E-07 4.40E-08 5.10E-08
URI (ΔCDF)       -5.20E-09 -1.20E-08 -1.90E-08 -2.60E-08 -3.20E-08
PLE N/A N/A N/A NO NO NO NO NO
                 
Indicator value       -1.27E-08 2.28E-07 1.01E-07 1.80E-08 1.90E-08

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.

2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF)       -6.50E-08 -6.50E-08 1.00E-07 2.00E-08 -8.90E-09
URI (ΔCDF)       -4.50E-08 -5.00E-08 -5.40E-08 -5.60E-08 -5.90E-08
PLE N/A N/A N/A NO NO NO NO NO
                 
Indicator value       -1.10E-07 -1.15E-07 4.60E-08 -3.60E-08 -6.79E-08

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

1Q/08: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

4Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

3Q/07: Changed PRA Parameter(s). Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices will be calculated and reported when sufficient quarterly data has been entered to support valid calculation of time-averaged indices.

2Q/07: Changed PRA Parameter(s). Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
UAI (ΔCDF)       -8.20E-09 4.90E-08 2.50E-08 1.30E-08 1.50E-08
URI (ΔCDF)       -1.00E-07 -1.00E-07 -1.00E-07 -1.00E-07 -1.00E-07
PLE N/A N/A N/A NO NO NO NO NO
                 
Indicator value       -1.08E-07 -5.10E-08 -7.50E-08 -8.70E-08 -8.50E-08

Licensee Comments:

2Q/08: Beginning in the 2nd quarter 2008, the data reported reflects a lack of historical operational data needed to maintain the adequate degree of accuracy required by this PI. Until further notice, MSPI performance threshold crossings will be assessed by the NRC Unit 1 augmented baseline inspection plan.

1Q/08: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

4Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices values will be calculated and reported when sufficient quarterly data has been entered to support valid calculations of time averaged indices.

3Q/07: Browns Ferry Unit 1 quarterly data entry began with 3rd Quarter 2007. Unavailability and Unreliability Indices will be calculated and reported when sufficent quarterly data has been entered to support valid calculation of time-averaged indices.

2Q/07: Unit 1 was restarted on 5/22/07. Per NRC's 5/16/07 letter to TVA on Unit 1 full transition to the Reactor Oversight Process (ADAMS accession ML0713603010), the PI data for the BF1 IE, MS, and BI cornerstones should be submitted, according to IMC 0608 and industry guidance, commencing with the third quarter of CY 2007.






Link to Notes

Reactor Coolant System Activity 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum activity                     N/A 0.000119
Technical specification limit 0 0 0 0 0 0 0 0 0 0 3.2 3.2
                         
Indicator value                     N/A 0
Reactor Coolant System Activity 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum activity 0.000133 0.000108 0.000083 0.000078 0.000081 0.000119 0.000099 0.000094 0.000081 0.000085 0.000045 0.000049
Technical specification limit 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2 3.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/06 8/06 9/06 10/06 11/06 12/06 1/07 2/07 3/07 4/07 5/07 6/07
Maximum leakage                     1.900 2.080
Technical specification limit 0 0 0 0 0 0 0 0 0   30.0 30.0
                         
Indicator value                     6.3 6.9
Reactor Coolant System Leakage 7/07 8/07 9/07 10/07 11/07 12/07 1/08 2/08 3/08 4/08 5/08 6/08
Maximum leakage 2.430 2.260 2.330 2.560 2.530 2.790 3.880 2.670 2.760 2.770 2.890 3.110
Technical specification limit 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
                         
Indicator value 8.1 7.5 7.8 8.5 8.4 9.3 12.9 8.9 9.2 9.2 9.6 10.4

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful opportunities 44.0 24.0 0 7.0 8.0 55.0 6.0 3.0
Total opportunities 44.0 24.0 0 8.0 8.0 56.0 6.0 3.0
                 
Indicator value   98.9% 98.9% 98.3% 98.3% 98.1% 98.1% 98.7%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Participating Key personnel 69.0 68.0 63.0 66.0 66.0 68.0 62.0 56.0
Total Key personnel 69.0 68.0 65.0 67.0 67.0 68.0 64.0 61.0
                 
Indicator value 100.0% 100.0% 96.9% 98.5% 98.5% 100.0% 96.9% 91.8%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
Successful siren-tests 793 798 797 795 798 698 999 596
Total sirens-tests 800 800 800 800 800 700 1000 600
                 
Indicator value 99.6% 99.6% 99.5% 99.5% 99.6% 99.6% 99.7% 99.7%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/06 4Q/06 1Q/07 2Q/07 3Q/07 4Q/07 1Q/08 2Q/08
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Physical Protection information not publicly available.



 
 
 
 