FY 2008 Interstate Maintenance Discretionary (IMD) Awards (as of August 13, 2008)
This table is also available in the following formats:
State |
Project |
Designated Amount in Joint Explanatory Statement (1) |
Award Amount After Rescission, Lop-Off & Takedowns (2) |
Funds Allocated to State |
Funds Yet to be Allocated to State |
Alabama |
I-85 at Exit 70 (CR-388, Cusseta Road) and at Exit 77 (CR-208, Fairfax Road), Chambers County - upgrade existing interchange lighting |
$125,000.00 |
$113,068 |
|
$113,068 |
Arizona |
I-10, from Sarival to Loop 101, western Maricopa County - roadway reconstruction, including adding general purpose lanes, HOV lane, and auxiliary lanes |
$1,375,000.00 |
$1,243,742 |
|
$1,243,742 |
Arkansas |
Interstates 430/630 Interchange, City of Little Rock, Pulaski County - interchange reconstruction |
$3,180,000.00 |
$2,424,167 |
|
$2,424,167 |
California |
Interstate 10, Pepper Avenue, in and near Colton, San Bernardino County - interchange reconstruction |
$1,000,000.00 |
$2,876,437 |
|
$2,876,437 |
California |
Lathrop Road/Interstate 5 Interchange, within the City of Lathrop, San Joaquin County - interchange reconstruction |
$500,000.00 |
$904,540 |
|
$904,540 |
California |
Ranchero Road Corridor, Ranchero Road/I-15 Interchange, Hesperia, San Bernardino County - construction of a six-lane interchange at Ranchero Road and Interstate 15 |
$1,500,000.00 |
$452,270 |
|
$452,270 |
California |
Rancho Cucamonga, I-15/Baseline Road Interchange, San Bernardino County - interchange reconstruction |
$750,000.00 |
$1,356,810 |
|
$1,356,810 |
California |
San Diego Freeway (I-405), from Bear Street to Fairview Road, City of Costa Mesa, Orange County - roadway rehabilitation, including pavement repair |
$500,000.00 |
$452,270 |
|
$452,270 |
California |
State Route 56 Connectors at I-5, Diego County - construct direct freeway to freeway connectors |
$500,000.00 |
$452,270 |
|
$452,270 |
Colorado |
I-225 corridor from I-70 to Parker Road in Aurora, Arapahoe County - roadway widening and interchange reconstruction, consistent with the NEPA documents for this corridor |
$670,000.00 |
$606,042 |
|
$606,042 |
Colorado |
Interstate 25 and State Highway 16 Interchange (Exit 132, Fort Carson Interchange), El Paso County - interchange reconstruction |
$2,260,000.00 |
$2,044,260 |
|
$2,044,260 |
Colorado |
I-25 North of SH 66, between MP 250 and 260, Larimer County - roadway rehabilitation, including rubbilizing the existing concrete pavement and overlaying with hot mix asphalt |
$500,000.00 |
$452,270 |
|
$452,270 |
Colorado |
I-70 Stapleton Interchange, I-70 Eastbound On and Off-Ramps at Havana, Denver - roadway rehabilitation, including resurfacing and widening the on-ramp, and interchange operational improvements |
$500,000.00 |
$452,270 |
|
$452,270 |
Colorado |
I-76 (Colorado's NE Gateway), from Fort Morgan to Brush, Morgan County - design, right-of-way and utilities for roadway reconstruction |
$500,000.00 |
$452,270 |
|
$452,270 |
Delaware |
Delaware Turnpike, I-95, New Castle County - roadway resurfacing |
$1,490,000.00 |
$1,347,764 |
|
$1,347,764 |
Florida |
Interstate 75/Collier Boulevard/SR 84 Interchange, Collier County - preliminary engineering for interchange improvements |
$500,000.00 |
$452,270 |
|
$452,270 |
Florida |
Interstate 75/Everglades Boulevard Interchange, Collier County - study for new interchange |
$250,000.00 |
$226,135 |
|
$226,135 |
Florida |
I-75 (SR-93) Griffin Road Interchange, Broward County - interchange reconstruction |
$1,500,000.00 |
$1,356,810 |
|
$1,356,810 |
Florida |
I-95 Interchange at Yamato Road and Spanish River, Boca, Palm Beach County - improvements to the interchanges at Yamato Road and Spanish River |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Florida |
I-95 Interchange, between Glades Road and Yamato Road, Boca Raton, Palm Beach County - new interchange between Glades Road and Yamato Road |
$500,000.00 |
$452,270 |
|
$452,270 |
Florida |
Interstate 75 at US 301, Manatee County - interchange reconstruction |
$500,000.00 |
$452,270 |
|
$452,270 |
Georgia |
I-85 at CR98/Gabbettville Road, Troup County - construction of diamond interchange with relocated and reconstructed Gabbettville Road at I-85 |
$1,125,000.00 |
$1,017,607 |
|
$1,017,607 |
Georgia |
Lee Road bridge at I-20, Douglas County - acquisition of right-of-way to reconstruct the Lee Road Interchange over I-20 and widen Lee Road from 1300 feet south of I-20 to Vulcan Drive |
$500,000.00 |
$452,270 |
|
$452,270 |
Hawaii |
Interstate Route H-1 at Kinau Street Off-Ramp, Honolulu - construct a right turn lane from the Kinau Street Off-Ramp to Lusitana Street |
$3,900,000.00 |
$3,527,706 |
|
$3,527,706 |
Hawaii |
Kapolei Interchange Complex, Interstate H-1, Mile Post 0.341 to Mile Post 1.116, Honolulu - interchange reconstruction |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Idaho |
I-84, from Curtis Road to Broadway, Boise, Ada County - roadway reconstruction, including addition of lanes |
$1,500,000.00 |
$1,356,810 |
|
$1,356,810 |
Iowa |
I-235 Storm Water Management, Polk County - reconstruct storm water and sewer infrastructure associated with the I-235 |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Iowa |
Interstate 29 Reconstruction/Utility Relocation, Sioux City, Woodbury County - utility adjustment and relocation of utilities as required with the reconstruction of Interstate 29 |
$1,050,000.00 |
$949,767 |
|
$949,767 |
Iowa |
Interstate 80, from just east of the I-380 Interchange in Coralville to east of Iowa 1 in Iowa City, Johnson County - replacement and widening of I-80 in both directions |
$500,000.00 |
$452,270 |
|
$452,270 |
Iowa |
I-29 interchange with U.S. 34, Mills County - bridge and interchange reconstruction |
$250,000.00 |
$226,135 |
|
$226,135 |
Kansas |
Interchanges at I-235 and US-54 (Kellogg) and I-235 and Central Avenue, and I-235 between those two interchanges in Wichita, Sedgwick County - preliminary engineering and right-of-way costs for roadway and interchanges reconstruction |
$500,000.00 |
$452,270 |
|
$452,270 |
Kansas |
I-70 Viaduct from Polk Street to Quincy Street, Topeka, Shawnee County - preliminary engineering to develop plan for realignment and reconstruction of viaduct |
$750,000.00 |
$678,405 |
$676,935.00 |
$1,470 |
Kentucky |
Ohio River Bridges Project, Louisville, Jefferson County - rebuild I-65 bridge over Ohio River, and reconstruct the "Spaghetti Junction" interchange where I-65, I-64 and I-71 meet |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Louisiana |
I-20 Transportation Corridor, Lincoln Parish - pavement rehabilitation on I-20 |
$500,000.00 |
$452,270 |
|
$452,270 |
Maine |
I-295 at Exit 4 (U.S.-1), South Portland, Cumberland County - interchange improvements |
$375,000.00 |
$339,203 |
|
$339,203 |
Maryland |
I-270 at Maryland 85, Frederick County - upgrade the I-270/MD 85 interchange to relieve congestion and provide capacity for planned commercial development |
$500,000.00 |
$452,270 |
|
$452,270 |
Maryland |
I-695 (Baltimore Beltway), from I-83 to I-95 east, including the MD 139 interchange, Baltimore County - upgrade to an 8-lane facility and address major traffic congestion and safety concerns, including replacement of existing structurally deficient Charle |
$750,000.00 |
$678,405 |
|
$678,405 |
Massachusetts |
I-91, from Longmeadow to Bernardston, Hampden, Hampshire and Franklin Counties - installation of a fiber optic backbone (direct-burial conduit) along the entire length of the I-91 and sections of the I-291 traffic corridors, and installation of ITS device |
$1,000,000.00 |
$904,540 |
$902,580.00 |
$1,960 |
Massachusetts |
I-93 Lowell Junction area, in the Towns of Andover, Tewksbury and Wilmington, Middlesex and Essex Counties - roadway reconstruction, including new interchange on I-93, additional lanes on I-93 (both directions), and access roads |
$400,000.00 |
$361,816 |
|
$361,816 |
Massachusetts |
I-495 Southbound Ramp, Mansfield and Norton, Bristol County - construct southbound on-ramp from Route 140 to southbound I-495 in Mansfield at Interchange 11 |
$750,000.00 |
$678,405 |
|
$678,405 |
Michigan |
I-75 under M-21/Corunna Rd, Flint, Genesee County - bridge replacement |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Michigan |
I-94/I-275 interchange, Romulus, Wayne County - interchange reconstruction including reconstruction of three ramps, rehabilitation of three bridges, guardrail, signs, pavement markings, drainage, and maintenance of traffic |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Michigan |
I-96 at Latson Road, Livingston County - construction of a new Latson Road bridge over I-96 and a diamond interchange |
$500,000.00 |
$452,270 |
|
$452,270 |
Michigan |
I-696 from M-53 to I-94 (from M-97 to west of I-94), cities of Warren and Roseville, Macomb County - roadway rehabilitation including pavement patching and diamond grinding, intermittent barrier and curb and gutter replacement, signs, pavement markings, r |
$500,000.00 |
$452,270 |
|
$452,270 |
Minnesota |
I-35/MN TH-95, near North Branch, Chisago County - design and reconstruction of TH- 95/Interstate 35 interchange |
$1,500,000.00 |
$1,356,810 |
|
$1,356,810 |
Minnesota |
I-35W Reconstruction Design, between I-694 in New Brighton and Lexington Avenue in Blaine, Anoka and Ramsey Counties - design and environmental assessment to define the scope and timing of future improvements |
$900,000.00 |
$814,086 |
|
$814,086 |
Mississippi |
Byram-Clinton Norrell Corridor, beginning at the I-55 Interchange with Siwell Road then northwest to the I-20 Interchange with Norrell Road, Hinds County - resurfacing and reconstruction of the I-55/Siwell Road and the I-20/Norrell Road interchanges |
$500,000.00 |
$452,270 |
|
$452,270 |
Missouri |
I-5 and I-44 Interchange, Laclede County - interchange improvements, including ramp modifications to improve efficiency, pedestrian/ADA accommodations, and possibly ITS deployment and minor bridge rehabilitation |
$500,000.00 |
$452,270 |
|
$452,270 |
Missouri |
I-44 and Route 266 Interchange, Greene County - interchange improvements, including ramp modifications, bridge rehabilitation, relocation of outer roads, and widening and relocation of Route 266 into the interchange |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Missouri |
I-270 from Manchester Road to Route 30, and I-44 from Route 141 to Lindbergh, St. Louis County - study to alleviate congestion at the I-270/I-44 interchange |
$250,000.00 |
$226,135 |
|
$226,135 |
Montana |
I-15 Helena Custer Avenue Interchange, Lewis & Clark County - design and construction of an interchange between I-15 and Custer Avenue, including addition of lanes, realignment of the frontage road, and reconstruction of the street overpass and the Inters |
$1,005,000.00 |
$909,063 |
$907,093.00 |
$1,970 |
Nebraska |
I-80 Westbound Bridge over Missouri River, Omaha, NE to Council Bluffs, IA; Douglas County, NE and Pottawattamie County, IA - new 5-lane bridge with shoulder approach work, lighting and utilities |
$600,000.00 |
$542,724 |
|
$542,724 |
Nevada |
Interstate 80 at Fernley, Lyon County - construction of full diamond interchange |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Nevada |
Interstate 15 at Starr Road, Henderson, Clark County - construction of a complete interchange at I-15 and Starr Road |
$500,000.00 |
$452,270 |
|
$452,270 |
New Mexico |
I-25 Mesa del Sol Interchange, near milepost 217, Albuquerque, Bernalillo County - preliminary engineering, right of way acquisition and construction of a new diamond interchange |
$500,000.00 |
$452,270 |
|
$452,270 |
North Carolina |
I-40, from exit 73 to NC 226, McDowell County - pavement rehabilitation |
$1,000,000.00 |
$904,540 |
$902,580.00 |
$1,960 |
North Carolina |
I-40/I-77 interchange, Iredell county - interchange reconstruction |
$750,000.00 |
$678,405 |
$676,935.00 |
$1,470 |
North Carolina |
I-77, from 5th Street in Charlotte to NC 73, Mecklenburg County - additional lanes to I-77 from 5th Street to NC 73, including proposed high occupancy vehicle (HOV) lanes and value pricing options |
$500,000.00 |
$452,270 |
|
$452,270 |
North Carolina |
I-95, from I-95 Business (Exit 56) to I-40 (Exit 81), Cumberland, Harnett, and Johnston Counties - rehabilitate existing pavement and structures and widen to 8 lanes |
$750,000.00 |
$678,405 |
$676,935.00 |
$1,470 |
North Dakota |
I-29/52nd Avenue South Interchange, Fargo, Cass County - reconstruct and widen the interchange structure and ramps |
$670,000.00 |
$604,729 |
$604,729.00 |
|
Ohio |
Brent Spence Bridge Study, within the I-75 corridor in the City of Cincinnati from the Ohio River to just north of the Western Hills Viaduct, Hamilton County - study and design of modifications to the highway and interchanges on I-75 in coordination with |
$670,000.00 |
$606,042 |
|
$606,042 |
Ohio |
Interstate 70/71 Cap Project, Interstates 70 and 71, Downtown Columbus, Franklin County - roadway reconstruction, including interchange modifications and caps over the Interstate |
$350,000.00 |
$316,589 |
|
$316,589 |
Ohio |
Galbraith Road Interchange at I-75, Hamilton County - design of new northbound exit ramp from IR75 to Galbraith Road |
$500,000.00 |
$452,270 |
|
$452,270 |
Ohio |
I-280 Veterans Glass City Skyway Lighting Enhancement, I-280 Maumee River Crossing Bridge, Toledo, Lucas County - preliminary engineering work for retrofitting of existing lighting system |
$500,000.00 |
$452,270 |
|
$452,270 |
Ohio |
I670/Stelzer Road Interchange, at Columbus International Airport, Columbus, Franklin County - reconstruction of interchange |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Ohio |
I-71 Access Improvements, from the Ohio River to the Dana Avenue Interchange, Hamilton County - study of access improvements and modifications to the Interstate System |
$750,000.00 |
$678,405 |
|
$678,405 |
Ohio |
I-71/SR 665 Interchange, Grove City, Franklin County - design and construction of interchange improvements |
$500,000.00 |
$452,270 |
|
$452,270 |
Oklahoma |
I-44 Arkansas River East to Yale Avenue, from Riverside Drive to Yale Avenue, in Tulsa, Tulsa County - reconstruction of approximately 3.5 miles of I-44 through Tulsa |
$500,000.00 |
$452,270 |
|
$452,270 |
Oklahoma |
I-40 Crosstown Expressway, from I-44 to I-235 in Oklahoma City, Oklahoma County - realignment of approximately 4 miles of the I-40 Crosstown Expressway through downtown Oklahoma City |
$500,000.00 |
$452,270 |
|
$452,270 |
Oregon |
I-5 Columbia River Crossing, Portland, Multnomah County - environmental impact statement (EIS) for a new I-5 bridge over the Columbia River |
$750,000.00 |
$678,405 |
$676,935.00 |
$1,470 |
Oregon |
I-5, Wilsonville Interchange, Exit 283, Clackamas County - roadway and interchange reconstruction |
$500,000.00 |
$452,270 |
|
$452,270 |
Oregon |
I-84 Burnt River Canyon, between milepoints 330.75 and 342.13, Baker County - realign segments of I-84 in an area noted for sharp curves and high rates of truck related accidents, and intelligent transportation system (ITS) technologies that will give mot |
$1,340,000.00 |
$1,212,084 |
$1,209,457.00 |
$2,627 |
Pennsylvania |
Junction of Pennsylvania Turnpike and Interstate 95, Bristol and Bensalem Townships, Bucks County - construct new interchange and widen both routes to six lanes within project limits |
$700,000.00 |
$633,178 |
$631,806.00 |
$1,372 |
Rhode Island |
I-195 at I-95 and the Providence River, Providence County - construction of a 1.5 mile segment of highway and bridge crossing over the Providence River |
$1,500,000.00 |
$1,356,810 |
|
$1,356,810 |
South Carolina |
I-385 at Fairview Street (Road S-543) Interchange, Greenville County - interchange reconstruction |
$375,000.00 |
$339,203 |
|
$339,203 |
South Carolina |
I-95 and SC 327/S-26 (North Williston Road) Interchange, approximately 7.0 miles northeast of Florence, Florence County - interchange reconstruction |
$500,000.00 |
$452,270 |
|
$452,270 |
South Carolina |
I-95 and US 301 Interchange, adjacent to the Town of Santee, Orangeburg County - interchange reconstruction |
$4,000,000.00 |
$3,618,160 |
|
$3,618,160 |
South Carolina |
I-95 / US 278 Interchange, Beaufort and Jasper Counties - safety and operational improvements on the US 278 corridor at the I-95 interchange |
$250,000.00 |
$226,135 |
|
$226,135 |
Tennessee |
Interstate 75, interchanges at State Route 68 (Exit 60) and State Route 322 (Exit 62), near Sweetwater, Monroe County - install high mast lighting |
$500,000.00 |
$452,270 |
|
$452,270 |
Texas |
I-35W Congestion Relief, I-35W at I-820 in the city of Fort Worth, Tarrant County - reconstruction of interchange with the addition of managed lane connections |
$350,000.00 |
$316,589 |
|
$316,589 |
Texas |
Interstate 69 (Texas Portion) junctions with Interstate 30 near Texarkana, Interstate 20 near Marshall, and Interstate 37 near Corpus Christi - preliminary engineering for resurfacing, rehabilitation, restoration and reconstruction (4R) activities and pos |
$1,000,000.00 |
$904,540 |
|
$904,540 |
Texas |
University of Texas at El Paso, I-10 Westbound Off-Ramp at Schuster, El Paso County - reconstruction of the westbound off-ramp at Schuster Sun Bowl Drive |
$500,000.00 |
$452,270 |
|
$452,270 |
Utah |
I-15 Bluff Street Interchange, SR-18, Washington County - interchange reconstruction |
$700,000.00 |
$633,178 |
|
$633,178 |
Utah |
I-15 Dixie Drive Interchange, at milepost 5 in St. George, Washington County - environmental documentation for construction of a new interchange |
$500,000.00 |
$452,270 |
|
$452,270 |
Virginia |
I-95/Fairfax County Parkway Interchange, Northbound I-95 off-ramp, Exit 166, Fairfax County - final design of a dual lane directional off-ramp from northbound I-95 to northbound Fairfax County Parkway |
$2,010,000.00 |
$1,818,125 |
|
$1,818,125 |
Washington |
I-5 Port of Tacoma Interchange, within the City of Fife, Pierce County - interchange reconstruction |
$1,000,000.00 |
$904,540 |
$902,580.00 |
$1,960 |
Washington |
I-5/I-205 Salmon Creek Interchange, Vancouver, Clark County - interchange construction |
$700,000.00 |
$633,178 |
$631,806.00 |
$1,372 |
Washington |
I-5/SR510 Lacey Interchange Improvement, through Lacey, Thurston County - complete the Lacey Transportation Systems Analysis and Alternatives Evaluation (LTSAAE), a comprehensive transportation corridor study of the Interstate system through Lacey, inclu |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Washington |
I-5/SR18/SR161 - Triangle Project, Federal Way, King County - design, right-of-way, and reconstruction of interchange |
$500,000.00 |
$452,270 |
$451,290.00 |
$980 |
Wyoming |
Interstate 25 Reconstruction, between Glenrock and Hat Six Road near Casper, Natrona County - roadway reconstruction, including widening and overlay as well as installing intelligent transportation system (ITS) improvements |
$950,000.00 |
$859,313 |
|
$859,313 |
Total |
|
$74,270,000.00 |
$68,924,635 |
$12,108,111.00 |
$56,816,524 |
- All FY2008 available IMD funds were designated for specific projects by Congress in the Joint Explanatory Statement accompanying the FY2008 Consolidated Appropriations Act
- SAFETEA-LU authorized $100 million for IMD for FY 2008. After the rescission in Section 186 of Division K of the FY 2008 Consolidated Appropriations Act (Public Law 110-161), and the 7.9% reduction for the FY2008 obligation limitation lop-off under Section 120(e) of Division K of the FY2008 Consolidated Appropriations Act, $73,334,625 was available for these designated projects. All of these projects were designated for funding in the Joint Explanatory Statement accompanying the FY 2008 Consolidated Appropriations Act.
|
Contact
Bob Wright
Office of Program Administration 202-366-4630 E-mail Bob
|