Search Options | ||||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us |
§ 2.340 Initial decision in certain contested proceedings; immediate effectiveness of initial decisions; issuance of authorizations, permits and licenses.(a) Initial decision—production or
utilization facility operating license. In
any initial decision in a contested
proceeding on an application for an
operating license (including an
amendment to or renewal of an
operating license) for a production or
utilization facility, the presiding officer
shall make findings of fact and
conclusions of law on the matters put
into controversy by the parties to the
proceeding, any matter designated by
the Commission to be decided by the
presiding officer, and any matter not put
into controversy by the parties, but only
to the extent that the presiding officer
determines that a serious safety,
environmental, or common defense and
security matter exists, and the (b) Initial decision—combined license
under 10 CFR part 52. In any initial
decision in a contested proceeding on
an application for a combined license
(including an amendment to or renewal
of a combined license) under subpart C (c) Initial decision on finding under
10 CFR 52.103 with respect to
acceptance criteria in nuclear power
reactor combined licenses. In any initial
decision under § 52.103(g) of this
chapter with respect to whether
acceptance criteria have been or will be
met, the presiding officer shall make
findings of fact and conclusions of law
on the matters put into controversy by
the parties to the proceeding, and on
any matters designated by the
Commission to be decided by the (d) Initial decision—manufacturing
license under 10 CFR part 52. In any
initial decision in a contested
proceeding on an application for a
manufactured license (including an
amendment to or renewal of a combined
license) under subpart C of part 52 of
this chapter, the presiding officer shall
make findings of fact and conclusions of
law on the matters put into controversy
by the parties to the proceeding, and
any matter designated by the
Commission to be decided by the (e) Initial decision—other proceedings
not involving production or utilization
facilities. In proceedings not involving (f) Immediate effectiveness of certain
decisions. An initial decision directing
the issuance or amendment of a limited work authorization under 10 CFR 50.10,
an early site permit under subpart A of
part 52 of this chapter, a construction (g)–(h) [Reserved] (i) Issuance of authorizations, permits, and licenses—production and utilization facilities. The Commission, the Director of New Reactors, or the Director of Nuclear Reactor Regulation, as appropriate, shall issue a limited work authorization under 10 CFR 50.10, an early site permit under subpart A of part 52 of this chapter, a construction permit or construction authorization under part 50 of this chapter, an operating license under part 50 of this chapter, a combined license under subpart C of part 52 of this chapter, or a manufacturing license under subpart F of part 52 of this chapter within 10 days from the date of issuance of the initial decision: (1) If the Commission or the appropriate Director has made all findings necessary for issuance of the authorization, permit or license, not within the scope of the initial decision of the presiding officer; and (2) Notwithstanding the pendency of a petition for reconsideration under § 2.345, a petition for review under § 2.341, or a motion for stay under § 2.342, or the filing of a petition under § 2.206. (j) Issuance of finding on acceptance criteria under 10 CFR 52.103. The Commission, the Director of New Reactors, or the Director of Nuclear Reactor Regulation, as appropriate, shall make the finding under 10 CFR 52.103(g) that acceptance criteria in a combined license have been, or will be met, within 10 days from the date of issuance of the initial decision: (1) If the Commission or the appropriate Director has made the finding under § 52.103(g) that acceptance criteria have been, or will be met, for those acceptance criteria which are not within the scope of the initial decision of the presiding officer; and (2) Notwithstanding the pendency of a petition for reconsideration under § 2.345, a petition for review under § 2.341, or a motion for stay under § 2.342, or the filing of a petition under § 2.206. (k) Issuance of other licenses. The
Commission or the Director of Nuclear
Material Safety and Safeguards, or the (1) If the Commission or the appropriate Director has made all findings necessary for issuance of the license, not within the scope of the initial decision of the presiding officer; and (2) Notwithstanding the pendency of a petition for reconsideration under § 2.345, a petition for review under § 2.341, or a motion for stay under § 2.342, or the filing of a petition under § 2.206. [72 FR 49475, Aug. 28, 2007; 73 FR 5717, Jan. 31, 2008] |
Privacy Policy |
Site Disclaimer |