MIPP Upgrade Proposal (P-960)
Following a request by the Fermilab management, MIPP
submitted a proposal to the laboratory which was considered by the Fermilab PAC
on October 19, 2006. The PAC found the set of proposed measurement to be very
valuable in general. However, they felt that MIPP needs to
- Strengthen
the collaboration further
- Show
publishable quality results from its first run
- Give
quantitative arguments as to how the proposed measurements will benefit
the hadronic shower simulators, the neutrino program, and the missing
baryon resonance search.
The Fermilab director concurred with the PAC findings.
P-960 Proposal
P-960 WBS document
Letter from Pier Oddone
PAC recommendation document
ILC Calorimeter Review 2007
MIPP Upgrade got mention in two different places in the ILC calorimeter review document.
- See Page 4 on a discussion of Tagged neutral beams, MIPP and ILC calorimetry
- See Page 16 on the importance of MIPP Upgrade data on particle production on 30 nuclei for calorimeter simulations
Details on various aspects of the upgrade
- Readout back-end electronics specification (shared for TPC, wire chambers, etc.): MIPP-doc-186
- Wire Chamber front-end electronics specification: MIPP-doc-185
RR 8-Nov-2006, HM 14-Apr-2007