Sign up for e-mail updates for Standard Cost Categories for Capital Projects
SCC Workbook Rev. 11, June 4, 2008
In 2005 FTA implemented the Standard Cost Categories, to establish a consistent format for the reporting, estimating, and managing of capital costs for New Starts projects. The cost information gathered from projects across the country will be developed into a database and become a cost estimating resource useful to FTA and the transit industry alike. The SCC Workbook is a project management tool -- project-based as opposed to grant-based.
Over the life of a project, the consistent format should make it easier to track, evaluate and control cost changes. Submission of capital costs to FTA in the SCC format is required at the following points:
- Request to enter Preliminary Engineering
- Request to enter Final Design
- Request for Full Funding Grant Agreement (FFGA)
- Submission for Annual New Starts evaluation
- FFGA amendments
- During construction at regular intervals
- At revenue operations
- Annually until the later of the submission of the Before & After Study or at project close-out and resolution of claims
Background Using the Worksheets Translating your cost estimate into the SCC format SCC Workbook Release Notes
|