  You are here: Skip Navigation LinksEM Home > Waste and Materials Disposition Information > Revision to the Record of Decision for the Department of Energy's Waste Management Program: Treatment and Storage of Transuranic Waste > Supplement Analysis For Transportation Of Transuranic Waste From The Mound Plant To Savannah River Site For Storage, Characterization, and Repackaging

Office of Environmental Management
Supplement Analysis For Transportation Of Transuranic Waste From The Mound Plant To Savannah River Site For Storage, Characterization, and Repackaging

(DOE/EIS-0200-SA02)

1.0   Purpose and Need for Action

As a result of its past and present activities and future plans, the Department of Energy’s (DOE) Mound Plant in Miamisburg, Ohio, currently has in inventory or expects to generate about 300 cubic meters of contact-handled (CH) transuranic (TRU) waste. Under the Waste Isolation Pilot Plant (WIPP) Land Withdrawal Act (Public Law No. 102-579), transport of TRU waste for disposal in WIPP, near Carlsbad, New Mexico, must be in the Type B containers certified by the Nuclear Regulatory Commission, e.g., the Transuranic Package Transporter-II (TRUPACT-II).

Most of the Mound Plant TRU waste (such as pipes and waste boxes), however, is too large to ship in TRUPACT-II containers, and the Mound Plant does not possess the necessary facilities or equipment to reduce the size of its TRU waste. Because DOE is closing the Mound Plant and the site is being converted into a commercial/industrial park, siting, construction, and operation of a new capability at the Mound Plant to repackage its TRU waste for shipment is not practical or cost-effective. DOE needs to ship its TRU waste from the Mound Plant to another site for repackaging into TRUPACT-II containers.

2.0   Proposed Action

DOE proposes to ship the TRU waste from the Mound Plant to the Savannah River Site (SRS) by OHOX railcars (formerly referred to as ATMX railcars). DOE is proposing SRS as a repackaging site for Mound TRU waste because SRS is currently managing and will continue to manage large amounts of TRU waste (about 12,000 cubic meters through 2033) in facilities designed for TRU waste containing plutonium-238, such as the Mound TRU waste. At SRS, the TRU waste would be stored, characterized, and then repackaged for shipment to WIPP for disposal.

3.0   Existing National Environmental Policy Act (NEPA) Analysis

The January 23, 1998, Record of Decision (ROD) (63 Fed. Reg. 3629) for DOE’s Waste Management Programmatic Environmental Impact Statement (WM PEIS) (DOE/EIS-0200-F, May 1997) records DOE’s decision to prepare TRU waste for disposal at WIPP at the sites at which TRU waste was generated and stored. The WM PEIS, however, identified and analyzed SRS as one DOE site among others that could receive shipments from other sites where it may be impractical to prepare the TRU waste for disposal. The WM PEIS analyzed shipments of TRU waste from the Mound Plant to SRS using TRUPACT-II containers on regular railcars.

4.0   Supplement Analysis – Is a Supplemental EIS Needed?

Under the proposed action, DOE would ship TRU waste, estimated to contain about 1,000 curies (about 300 cubic meters volume), from the Mound Plant to SRS. DOE would make up to ten shipments, each with one OHOX railcar loaded with TRU waste pre-packaged in steel inner containers (Type A containers). The U.S. Department of Transportation (DOT) issued an exemption to DOE to allow the transport of the Mound TRU waste in OHOX railcars, rather than in Type B packaging (DOT-E 5948, June 26, 2000). Under the conditions of the exemption and based on information submitted in support of the exemption application, the curie content would be limited to 200 curies or less for each railcar load. See Transportation Risk Assessment for TRU Waste Shipments from Mound, ANL, October 1999 (attached).

The WM PEIS analysis of transportation impacts considered the shipment of CH-TRU waste from the Mound Plant to SRS in ten shipments of six TRUPACT-II containers on a railcar, for a total of 1,392 curies. See Supplemental Information Related to Risk Assessment of the Off-Site Transportation of Transuranic Waste for the U.S. Department of Energy Waste Management Programmatic Environmental Impact Statement, Argonne National Laboratory (ANL)/EAD/TM-27 (December 1996) (Technical Report prepared for the WM PEIS). DOE has estimated that there would be a lower external exposure rate for the Mound TRU waste and that the risk of shipping Mound TRU waste in OHOX railcars would be no greater than that estimated in the WM PEIS under incident-free conditions.

Further, under severe accident scenario conditions (assumed to involve the breach of all six TRUPACT-II containers on a railcar – a highly unlikely event), the analysis in the WM PEIS assumed the highest possible curie loading on a railcar (approximately 2,078 curies), based on the most radioactive TRU waste in DOE’s complex-wide inventory (assumed to be at Los Alamos National Laboratory). This analysis assumed that 0.02 percent of the TRU waste in each TRUPACT-II container (or approximately 0.4 curies) would be released and respirable if a severe accident were to occur.

In an analysis of a severe accident involving the OHOX railcar (a fire scenario, which is expected to have the greatest release to the atmosphere) for the DOT exemption (cited above), DOE assumed that 0.05 percent of the Mound TRU waste would be released and respirable (see DOE Handbook, Airborne Release Fractions/Rates and Respirable Fractions for Nonreactor Nuclear Facilities, DOE-Handbook-3010-94, December 1994). Because the curie content of each OHOX railcar would be limited to 200 curies or less, DOE estimated that 0.1 curies or less would be released and respirable if a severe accident were to occur. Thus, with the 200-curie limit under the DOT exemption, the consequences of shipping Mound TRU waste in OHOX railcars would be no greater than those estimated in the WM PEIS, even under severe accident conditions.

5.0   Determination

Under the proposed transportation action compared to that analyzed for the WM PEIS, there would be a reduced total number of curies being shipped from the Mound Plant to SRS, a lower external exposure rate, and the same or lower number of shipments. Under even severe accident scenarios, the releases of plutonium would be similar to those previously analyzed. DOE concludes that the proposed action would not, under incident-free or accident conditions, present a substantial change relevant to environmental concerns or significant new circumstances or information relevant to environmental concerns and bearing on the proposed action or its impacts. Therefore, a supplement to the WM PEIS is not needed before revising the ROD for TRU waste shipments from the Mound Plant to SRS in OHOX railcars.

Approved in Washington, D.C., on this  13th day of July, 2001. 

________________________
Carolyn L. Huntoon
Acting Assistant Secretary for
    Environmental Management

The White House FirstGov.gov E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403

Web Policies | No Fear Act | Site Map | Privacy | Phone Book | Employment