[Coastal America logo]

Project Summary

Bolling AFB Potomac Shoreline Restoration

Regional Map


1. Project Identification

Name Bolling AFB Potomac Shoreline Restoration
Region Mid-Atlantic
State DC
Location Bolling AFB
Date of this update 7/30/99

2. Problem(s) addressed (check one or more)

Habitat Restoration/Protection  
 Wetlands
 River systems
 Beaches/Dunes
 Offshore areas X
 Mangroves
Assisting Species at Risk
Pollution Mitigation
 Non-Point Source Pollution
Other (describe)  

3. Project Description (100 words or less. Please include qualitative information, e.g. acres of habitat restored, miles of steam reopened to migration, and legislative authorization, e.g. WRDA, ISTEA, CWA/NEP, CZMA, etc.)

Air Force actions and previous uses in the BAFB area have resulted in degradation of the shoreline and adjacent harbor areas. The vegetation along the shoreline of BAFB exists for landscape purposes. Although some indigenous species of mature oak trees can be found in areas of the base, these trees have been planted. The only common species of fish and wildlife exist within the fence line and along the shoreline of the base. The project will clean up 6,000 feet of shoreline by clearing away old stumps, roots, concrete rubble, and other debris; repairing broken and/or collapsed storm drains and outfalls; and conducting the excavation for and the placement of geofabrics, storm rip rap and earthworks to repair the shoreline, thus preventing additional sedimentation into the river.

4. Goals/Benefits (quantify where possible using measures of success list) Was a cost-benefit study conducted for this project? yes/no If yes, provide a summary of findings.

Prevention of habitat degradation and loss and nonpoint source pollution. Project will protect the Potomac River and Chesapeake Bay from further deterioration by stabilizing the shoreline, thus reducing/eliminating erosion and protecting marine habitat from sedimentation damage.

5. Partners (include each participant's responsibilities - funding, permitting, etc.)

6. Funding/Contributions (organization and amount)

7. Legislative authorities used by each participant

---

8. Value added by Coastal America Partnership including Government Performance and Results Act (GPRA) goals achieved through this collaboration (500 words or less)

---

9. Project Status

Initiation date 1992
Completion date 1993/94
Current stage Completed

10. Contacts

11. Any additional information/comments

---

This page was last updated on Saturday, 24-Jun-2000 11:48:47 EDT
Coastal America * Coastal America Regions
Coastal America Reporters Building 300 7th Street, SW Suite 680 Washington, DC 20250
(202) 401-9928 * (202) 401-9821 (FAX)
comments to lawrencea@fas.usda.gov