The following is a list of the major projects approved by Ex-Im Bank's Board of Directors during 2006 that were categorized as either environmental Category A or B. The environmental factors associated with each project are summarized, as well as the time period for which the EIA was made available by Ex-Im Bank for each Category A project.

CATEGORY A TRANSACTIONS

CASE NO. PROJECT  COUNTRY
PROJECT NAME & LOCATION  (Brief Description)
KEY ENVIRONMENTAL FACTORS
AMOUNT FINANCED PERIOD OF EIA AVAILABILITY BOARD ACTION
AP082693 Mexico Strategic Gas Project (PEC), ongoing gasfield development at 14 on- and offshore locations in the States of Veracruz, Tabasco, Chiapas, Tamaulipas and Campeche Air Quality, Water Quality & Liquid Effluents, Wastes, Emergency & Spill Response, Natural Habitat (proximity to sensitive areas) $300.0 million 168 Days Approved 9/28/06
AP082260 Mexico Minatitlan Petroleum Refinery upgrade and expansion, in the State of Veracruz Air Quality, Water Quality & Liquid Effluents, Waste Management, Natural Habitat $100.0 million 151 Days Approved 7/13/06
AP082071 Uruguay Punta Del Tigre Gas Turbine Power Plant, San Jose, Uruguay Nationally protected areas, Air Quality, Water Quality, Solid Wastes, Noise $54.0 million 245 Days Approved 3/9/06

 

CATEGORY B TRANSACTIONS

CASE NO. PROJECT/ COUNTRY
PROJECT NAME & LOCATION   (Brief Description)
KEY ENVIRONMENTAL FACTORS CONSIDERED 
AMOUNT FINANCED BOARD ACTION
AP082223 Mexico Samalayuca II Gas Power Plant maintainence and rehabilitation, in the State of Chihuahua Air Quality, Water Quality, Solid Waste $24.3 million Approved 5/3/06
AP082250 Mexico Rio Bravo Gas Power Plant maintenance, in the State of Tamaulipsat Air Quality, Water Quality, Solid Waste $15.3 million Approved 7/28/06
AP082564 Mexico El Sauz Gas Power Plant maintenance, in the State of Queretaro Air Quality, Water Quality $27.3 million Approved 11/15/06
AP082635 Mexico Burgos Gas Fields, ongoing gas field development in the States of Tamalipas and Nuevo Leon Air Quality, Water Quality & Liquid Effluents, Wastes, Emergency Response, Natural Habitats $150.0 million Approved 9/14/06
AP082654 Mexico New Pidiregas Project, ongoing upstream oil field development in 23 on- and offshore locations in the States of Veracruz and Tabasco Air Quality, Water Quality & Liquid Effluents, Wastes, Emergency & Spill Response, Natural Habitats $350.0 million Approved 9/28/06
AP082679 Mexico Cantarell Oil Field Development, ongoing development in the Bay of Campeche Air Quality, Water Quality & Liquid Effluents, Wastes Management, Emergency & Spill Response $250.0 million Approved 9/28/06
AP082152 Turkey Bis Enerji 50 MW Gas Turbine Power Plant expansion, near Bursa, Turkey  Air Quality, Water Quality, Noise $14.5 million Approved 1/19/06
AP081530 Saudi Arabia Hadeed Direct Reduced Iron Plant Expansion, in Al-Jubail, Saudi Arabia Air Quality, Water Quality, Noise $64.9 million Denied 3/9/06
MSM-289637 Dominican Republic Construction, Expansion and/or Renovation of four airports, in Santo Domingo, Puerto Plata, Bahona and in the Region of Samana EHS Management, Construction & Operational Impacts, Siting & Land Acquisition, Fuel/Hazardous Materials & Including Emergency Response, Air Emissions, Water Supply, Stormwater Drainage & Effluent Discharges, Solid & Liquid Waste Management, Bird Hazards to Aircraft, Noise, Employee Health & Safety; And Community Development $7.8 million Approved 2/28/06

 

 