|
This message is posted with the originator's permission. R 051255Z DEC 07 ZUI ASN-A00339000002 ZYB FM COMDT COGARD WASHINGTON DC//CG-01// TO ALCOAST BT UNCLAS //N09094// ALCOAST 553/07 COMDTNOTE 9094 SUBJ: ANCIENT MARINER SITREP 3 - BERTHOLF UNDERWAY 1. DURING THIS PAST SUMMER, I HAD THE GREAT PLEASURE OF VISITING THE NORTHRUP GRUMMAN SHIPYARD IN PASCAGOULA, MS TO VISIT BERTHOLF. GIVEN ALL THE PUBLICITY THAT HAS SURROUNDED THIS CUTTER, I WANTED TO WALK THE DECKS TO GAIN A SENSE OF THE QUALITY OF WORKMANSHIP, THE FUNCTIONALITY OF DESIGN, AND THE ENHANCED CAPABILITIES THAT ULTIMATELY WILL BE DELIVERED TO THE FLEET TO SERVE OUR CUTTERMEN OVER THE NEXT FEW DECADES AS THEY CARRY OUT THEIR DUTIES. I LEFT PASCAGOULA EXCITED, VERY IMPRESSED, AND CONVINCED THAT BERTHOLF WILL BE THE FINEST, AND MOST CAPABLE CUTTER EVER DELIVERED TO THE COAST GUARD. 2. BERTHOLF TOOK A MAJOR STEP TOWARDS DELIVERING ON OUR EXPECTATIONS YESTERDAY WHEN SHE GOT UNDERWAY, FOR THE FIRST TIME, AS THE CONTRACTOR COMMENCED MACHINERY TRIALS. WHILE MUCH REMAINS TO BE DONE PRIOR TO GOVERNMENT ACCEPTANCE OF BERTHOLF (WHICH OCCURS AT DELIVERY IN SPRING 2008), DEPARTING THE PIER FOR THE FIRST TIME UNDER SHIPS POWER IS A NOTABLE ACHIEVEMENT. 3. DURING THE COMING MONTHS, THE COAST GUARD, OUR GOVERNMENT PARTNERS AND INDUSTRY WILL PREPARE CGC BERTHOLF, THE FIRST OF EIGHT NEW NATIONAL SECURITY CUTTERS (NSC), FOR TESTING AND DELIVERY. ADDITIONALLY, TRAINING CENTER PETALUMA AND OTHERS HAVE BEEN AGGRESSIVELY ENGAGED IN THE CRUCIAL WORK OF PREPARING THE CREWS WHO WILL GIVE LIFE TO THE CUTTER WHEN IT PROCEEDS TO ITS HOME PORT OF ALAMEDA, CALIFORNIA. THE NSC PROJECT TEAM, INCLUDING THE PROJECT MANAGERS REPRESENTATIVES OFFICE (PMRO) AND VALUED PARTNERS SUCH AS THE U.S. NAVY, HAS COME A LONG WAY IN THE THREE YEARS SINCE KEEL- LAYING. THEIR COMMITMENT AND DEDICATION TO OUR SUCCESS IS COMMENDABLE. AS WE PREPARE FOR BERTHOLFS ARRIVAL, I SHARE IN YOUR EXCITEMENT LOOKING FORWARD TO DELIVERY OF THE FIRST NSC. AS THE COMMANDANT HAS STATED, BERTHOLF AND HER SISTER SHIPS PROVIDE 21ST CENTURY CAPABILITIES THAT WILL ENABLE US TO PERFORM OUR VITAL MISSIONS MORE EFFECTIVELY, EFFICIENTLY AND SAFELY. 4. IN THE COMING WEEKS, THE ASSISTANT COMMANDANT FOR ACQUISITION, RADM GARY BLORE, THE DIRECTOR OF ACQUISITION PROGRAMS RDML RON RABAGO AND THE PROJECT STAFF WILL PRODUCE FOLLOW-ON MESSAGES WITH MORE DETAILS ON THE TESTING, EVALUATION AND ACCEPTANCE TRIALS PROCESS. MORE INFORMATION ON THE NSC CAN BE FOUND ONLINE AT HTTP://WWW.USCG.MIL/DEEPWATER/SYSTEM/NSC.HTM 5. AS WE LOOK TO THE FUTURE WITH BERTHOLF, WE MUST NEVER FORGET THE LEGACY OF OUR SEAGOING HERITAGE. THIS FRIDAY, IT WILL BE MY HONOR TO SERVE AS THE KEYNOTE SPEAKER AT A COMMEMORATION OF THE 66TH ANNIVERSARY OF THE ATTACK ON PEARL HARBOR. THE CEREMONY WILL TAKE PLACE IN BALTIMORES INNER HARBOR, ABOARD ONE OF OUR MOST FAMOUS CUTTERS, USCGC TANEY, THE LAST SURVIVING WARSHIP STILL AFLOAT FROM THE ATTACK ON PEARL HARBOR. AS WE HONOR ALL MEMBERS OF THE ARMED FORCES WHO SERVED IN WORLD WAR II, WE WILL ALSO REMEMBER THE GENERATIONS OF COAST GUARD CUTTERMEN WHO SERVED IN TANEY. WHAT AN EXCITING TIME TO BE IN THE COAST GUARD, CONTINUING THEIR LEGACY, AS BERTHOLF BEGINS A NEW CHAPTER IN OUR COAST GUARD HISTORY. 6. INTERNET RELEASE AUTHORIZED. 7. FAIR WINDS, VADM R. J. PAPP, CHIEF OF STAFF AND 13TH GOLD ANCIENT MARINER SENDS. BT
|