of Auction 50 - for lot numbers, inspection IDs, city, state,
zip codes, building and unit count; scattered site designation;
and estimated inspection duration.
|
|
Auction 50
– A Reverse Auction is planned to begin Saturday, September
20, 2008, at 10:00 a.m. and close on Saturday, September
20, 2008, at 4:00 p.m. (DST) Day Light Saving Time. This auction
will made up of public housing properties throughout the nation.
The period of performance will begin September 29, 2008
and will end on December 28, 2008 (90 calendar days).
If you are not already an eligible contractor, please submit all
information by the end of the day, September 14, 2008.
The properties in this auction have been re-configured for
HUD's "asset management project (AMP)" initiative. Attending a
pre-bid teleconference is a requirement. If you did NOT
attend one of the teleconferences held on August 21, August
22, or September 8, 2008, you must attend the teleconference
on Monday, September 15, 2008, at 5:00 p.m. Eastern time in
order to participate in Auction 50. It is anticipated that the
call will last less than one hour. The purpose of this mandatory
participation in the conference call is to ensure that all contractors
understand the additional steps which will be required to conduct
the inspections.
|
|
Preview
of Auction 49 - for lot numbers, inspection IDs, city, state,
zip codes, building and unit count; scattered site designation;
and estimated inspection duration.
|
|
Auction 49
– Auction 49 – A Reverse Auction is planned to begin Saturday,
September 13, 2008, at 10:00 a.m. and close on Saturday,
September 13, 2008, at 4:00 p.m. (DST) Day Light Saving Time.
This auction will made up of public housing properties in Hawaii.
The period of performance will begin September 22, 2008
and will end on December 21, 2008 (90 calendar days).
If you are not already an eligible contractor, please submit all
information by the end of the day, September 7, 2008.
The properties in this auction have been re-configured for HUD's
"asset management project (AMP)" initiative. Attending a pre-bid
teleconference is a requirement. If you did NOT attend
one of the teleconferences held on August 21 or 22, 2008,
you must attend the teleconference on Monday, September 8,
2008, at 5:00 p.m. Eastern time in order to participate in
Auction 49. It is anticipated that the call will last less than
one hour. The purpose of this mandatory participation in the conference
call is to ensure that all contractors understand the additional
steps which will be required to conduct the inspections.
|
|
Highlights
of the Teleconferences for Public Housing AMPs (August
21 and 22, 2008)
|
|
Special Offering
Statement for Auction 49
Contractors must abide by HUD’s inspection protocol and the
Reverse Auction Program’s Purchase Order Terms and Conditions
and Business Rules.
Reasonable extension request for inspections awarded in this auction
will only be granted in rare cases. Extension requests must include
a valid reason.
In addition, the following actions will be cause for termination
for default for all inspections awarded in Auction 49:
|
|
Failure to schedule inspections within 15 days of the award email. |
|
Failure
to update and maintain inspection schedule information in HUD’s Secure Systems. |
|
Failure
to have an active inspector assigned to a scheduled inspection. We are
pleased to announce some exciting new features available to all eligible contractors
on the auction web site. REAC’s RAP Team has developed innovative user-friendly,
web-based resources for inspection status and billing-related data. More about
these features. Log in to Global eProcure now to use these new features - https://hud.globaleprocure.com/
|
|
Ceiling Prices
for Auction 49 as follows:
Duration | Ceiling
Price | 0.5 Days = | $375
| 1 Days = | $575
| 1.5 Days = | $675
| 2 Days = | $1,000
| 2.5 Days = | $1,150
| 3 Days = | $1,300
| |
|
Inspection Review Notice:
Contractors should check the Inspection Review Web Page often. It is required
that posted challenges be responded to within 3 business days. If no response
is received within this time-frame, and REAC was not informed of any IT/ technical
difficulties, the inspection WILL BE REJECTED. Rejected inspections are
not subject to payment.
|
|
Reminder:
It is important that inspections are NOT over-scheduled, and that Scheduler is
kept up-to-date, as stated in the UPCS protocol. Contractors must ensure that
adequate resources are available prior to bidding. Failure to adhere to the UPCS
protocol and/or the Purchase Order Terms and Conditions may result in suspension
of an inspector, HUD-rejected inspections, and/or denial of participation in the
Reverse Auction Program. |
|