FAQs about the Second Street Utility Tunnel Repair Project
Print Version
 
Q:  What is the scope of work?  What will the repair work involve?
 
A:  The work will involve excavating Second Street from North Carolina Avenue to just past the intersection at C Street, S.E., in order to replace the utility tunnel’s roof and ensure the structural integrity of the tunnel for another 50+ years.  The street will be excavated from curb to curb one block at a time to minimize disruption and inconvenience to local residents. 
 
 
Q:  Will we still be able to use the sidewalks?
 
A:  Pedestrian walkways will be maintained at all times.  A solid, secure, eight-foot construction fence will line the perimeter of the project to ensure pedestrian safety. 
 
 
Q:  Will Providence Park be used for staging equipment or construction supplies.
 
A:  The playing field in Providence Park will not be affected by the tunnel repair work. 
Two construction trailers will be located on the perimeter of the park between the tree line and sidewalk for staff to manage the project on-site, however the staging of equipment and supplies will be done off-site.
 
 
Q:  Will the trees be protected or replaced if damaged?
 
A:  The contractor doing the repair work will be required to provide tree protection.  If the contractor damages a tree, they will be required to replace it.
 
 
Q:  What are the hours of construction?
 
A:  The project will follow the District’s regulations and conduct work Monday through Friday from 7 a.m. to 7 p.m.  Little or no weekend is work planned.  If weekend work is required, the AOC will provide advance notice to residents.
 
 
Q:  How long will the project take?
 
A:  Work is scheduled to begin in late summer 2008 and will take approximately 18-21 months from award to finish.  As a separate project to be completed prior to the excavation work, any asbestos-containing materials will be completely and safely removed from the tunnel and disposed of in accordance with EPA regulations.   
 
 
Q:  How will the work impact local traffic?
 
A:  The Tunnel Improvement Project Team is working with a traffic control engineer and the District’s Department of Transportation to coordinate a traffic plan for the neighborhood.  While excavation work is occurring, one block of Second Street at a time will be closed to traffic.  One lane of traffic will always be maintained on C Street and D Street (cross streets). 
 
When the traffic control plan is developed, the AOC will host another community meeting to provide more details to the residents and provide opportunity for further public comment. 
 
 
Q:  How will government services such as the fire and ambulance service and trash collection be affected?   Will there be any disruption to our utilities?
 
A:   The AOC has met with D.C. Fire and Rescue and they have developed a plan to ensure that emergency services will not be interrupted.  Trash collection and other government services will also be maintained throughout the project work.  No disruption to services is planned. 
 
 
Q:  Has the AOC coordinated this work with D.C. government?
 
A:  The AOC has been working closely with the Advisory Neighborhood Commissions, Councilman Tommy Wells’ office, and a number of D.C. agencies. 
 
 
Q:  Where can I find information about the project?  Who do I contact if there is a problem or concern?
 
A:  Project updates will be posted on the AOC’s Web site in the “Press Room,” when applicable –
http://www.aoc.gov/aoc/press-room/index.cfm.  Information will also be shared with Councilmember Wells and the ANC and they will post it on their respective Web sites. 
 
Contact Eva Malecki, AOC Communications Officer, at (202) 228-1793 with additional questions or concerns.  
 
 
AOC Begins Construction of Inaugural Stands; Capitol's West Front Closed as of Sept. 22
AOC Begins Construction of Inaugural Stands; Capitol's West Front Closed as of Sept. 22
 
AOC Moves Statues to Visitor Center_Sen 9-3-08
AOC Moves Statues to Visitor Center_Sen 9-3-08
 
AOC Moves Statues to Visitor Center 9-3-08
AOC Moves Statues to Visitor Center 9-3-08
 
2nd Street Work Zone Map
2nd Street Work Zone Map
 
KEY MILESTONE REACHED FOR CAPITOL VISITOR CENTER
AOC_CVC Recieves Temp Cert of Occupancy 7-21-08_FINAL
 
AOC's Shimizu Receives Amer Horticultural Society Award
AOC's Shimizu Receives Amer Horticultural Society Award
 
CVC Recognized With Craftsmanship Award
CVC Recognized With Craftsmanship Award
 
AOC To Begin Move of Statue of Freedom Model
AOC To Begin Move of Statue of Freedom Model
 
General Accounting Office
General Accounting Office website
 
FEMA
FEMA website
 
Phase I of Second Street Tunnel Repair Project
Phase I of Second Street Tunnel Repair Project

 

Architect of the Capitol · Feedback Form