Bonneville Power Administration

http://www.bpa.gov

Link to BPA Home Page Skip Primary Navigation
Link to BPA Home Page
  BPA Home Triangle Bullet Point Public Involvement Triangle Bullet Point Comment Listings Triangle Bullet Point 2007 Triangle Bullet Point Cascade Wind Interconnection Project
This is a spacer graphic
This is a spacer graphic Triangle bullet point Freedom of Information (FOIA)

This is a spacer graphic Triangle bullet point Submit Comments

This is a spacer graphic Triangle bullet point View FY08 Comments

This is a spacer graphic Triangle bullet point View FY07 & Older Comments

This is a spacer graphic Triangle bullet point Calendar

This is a spacer graphic Triangle bullet point Public Information Center

This is a spacer graphic Triangle bullet point Crime Witness Program

This is a spacer graphic Triangle bullet point Power - What's New

This is a spacer graphic Triangle bullet point Comments on BPA's Strategic Direction


Adjust your View!
 Link to USA.gov


Cascade Wind Interconnection Project




The following comments were submitted in response to the open comment period described below.

    BPA has been asked by UPC Oregon Wind, LLC to interconnect up to 50 megawatts of electricity generated from UPC’s proposed Cascade Wind Farm Project in Wasco County, Ore. to the Federal Columbia River Transmission System (FCRTS). UPC would independently build, own and operate the wind project and their associated facilities. BPA would construct a new switchyard (tap) beneath its existing Hood River-The Dalles 115-kilovolt transmission line to interconnect the wind project to the FCRTS. The proposed interconnection project is in the early stages of environmental review.

    Files larger than 2 MB have the size stated next to the date.

    For More Information:
    www.transmission.bpa.gov/Business/Rates_and_Tariff/


    Close of comment: 2007-08/10


If you believe information on this site is missing or in error, please Submit that comment here.
NOTICE: This site is owned and operated by the Bonneville Power Administration, United States Department of Energy. Use of this system is monitored by system and Security personnel. Anyone using this system consents to MONITORING of this use by system or security personnel. BPA Privacy Policy