ALCOAST 255/08 COMDTNOTE 5240 SUBJ: 2008 INDUSTRIAL MAINTENANCE INNOVATION AWARD A. INDUSTRIAL MAINTENANCE INNOVATION AWARD, COMDTINST 5240.6 1. THE INDUSTRIAL MAINTENANCE INNOVATION AWARD ENCOURAGES DEPOT LEVEL MAINTENANCE UNITS TO IMPROVE PROCESSES AND DELIVER EFFICIENT SERVICES TO OPERATIONAL CUSTOMERS BASED ON THE COMMANDANTS PERFORMANCE EXCELLENCE CRITERIA. 2. I AM PLEASED TO ANNOUNCE AND CONGRATULATE THE 2008 INDUSTRIAL INNOVATION AWARD WINNERS: A. PROCESS IMPROVEMENT CATEGORY: WINNER. NESU CLEVELAND: SAFE BOAT FOAM REMOVAL. NESU CLEVELAND WAS REPEATEDLY FACED WITH SAFETY AND ENVIRONMENTAL ISSUES WHEN CONDUCTING SAFE BOAT FUEL TANK REPAIRS. SAFE BOATS ARE COMMONLY PLAGUED WITH FUEL TANK LEAKS. THROUGH INGENIOUS SYSTEMATIC ROOT CAUSE ANALYSIS, NESU CLEVELAND DEVELOPED A SAFE AND EFFECTIVE IN-HOUSE SOLUTION FOR IMPROVING THE OVERALL PROCESS FOR SAFE BOAT HULL REPAIRS AND SAFETY CERTIFICATION. THIS EFFORT RESULTED IN A SIGNIFICANT REDUCTION IN SCHEDULED WORKDAYS AND REPAIR COSTS (ESTIMATED TO BE 86 PERCENT AND 65 PERCENT RESPECTIVELY). THIS PROCESS IS EASILY REPRODUCIBLE BY ANY UNIT AND IS PROVEN TO BE A PRACTICAL ALTERNATIVE TO THE COMMERCIAL REPAIR OPTION. B. IN THE INDIVIDUAL/TEAM CATEGORY: WINNER. ISC KETCHIKAN: CGC LONG ISLAND DRYDOCK PROJECT. THE ISC KETCHIKAN INDUSTRIAL WORK FORCE WAS TASKED TO ASSESS A SEVERELY DAMAGED PATROL BOAT AND DEVELOP AND EXECUTE A PLAN TO RESTORE IT TO ORIGINAL SPECIFICATIONS. THROUGH INNOVATIVE MEASUREMENT TECHNIQUES THAT INCLUDED PIANO WIRE AND ATMOSPHERIC MONITORING FOR MATERIAL EXPANSION AND CONTRACTION, THE INDUSTRIAL WORK FORCE, ALONGSIDE ELC AND MLCP(V), WAS ABLE TO ACCURATELY CALCULATE HULL FLUCTUATIONS AND MAINTAIN SHAFT ALIGNMENT WHILE REPLACING OVER 500 SQ FT OF SHIP HULL PLATING, DECKING AND BEARINGS. SUPERB TEAM COLLABORATION BETWEEN ISC KETCHIKAN, ELC AND MLCP(V) RESULTED IN RETURNING A VITAL COAST GUARD ASSET TO FULL OPERATIONAL STATUS. REPAIRS WERE COMPLETED ONE MONTH AHEAD OF SCHEDULE WITH A TOTAL COST SAVINGS OF OVER 800K AS COMPARED TO COMMERCIAL ESTIMATES. C. RUNNERS UP: THE FOLLOWING UNITS SUBMITTED NOTEWORTHY PACKAGES. (1) ISC PORTSMOUTH: RIGID HULL INFLATABLE BOAT REFURBISHING PROCESS. (2) LEGACY SUSTAINMENT SUPPORT UNIT: CREWLESS CUTTER DEPOT LEVEL MAINTENANCE. (3) ISC ST LOUIS: CASREP TRACKING SYSTEM. 3. WINNING NOMINATIONS WILL RECEIVE 1,000 DOLLARS FOR USE IN DEVELOPING INNOVATIVE MAINTENANCE PROCESSES AT THE UNIT. I COMMEND ALL OF THE UNITS WHO SUBMITTED APPLICATIONS FOR CONSIDERATION AND ENCOURAGE MAINTENANCE STAFFS TO CONTINUALLY ASSESS AND IMPROVE WORK PROCESSES AND TO SHARE THEIR SUCCESSES WITH OTHERS. 4. THE AWARD SUBMISSIONS ARE AVAILABLE AND MAY BE REVIEWED BY VISITING COMDT (CG-441) ON CG CENTRAL. 5. RELEASED BY MR. JEFFERY ORNER, ACTING ASSISTANT COMMANDANT FOR ENGINEERING AND LOGISTICS (CG-4), SENDS. 6. INTERNET RELEASE AUTHORIZED.