Bay Area Air Quality Management District spacer
Site Search      
spacer spacer
spacer spacer 2009 Clean Air Plan
spacer spacer spacer
spacer Meetings, Workshops, & Notices Plan Schedule and Status Reports
spacer Technical Documents Clean Air Plan
spacer CEQA Review Contact and Email Updates

2009 Clean Air Plan

The Air District is beginning the process to prepare the 2009 Bay Area Clean Air Plan.

The 2009 Bay Area Clean Air Plan will:

  • Update the Bay Area 2005 Ozone Strategy in accordance with the requirements of the California Clean Air Act to implement “all feasible measures” to reduce ozone
  • Consider the impacts of ozone control measures on particulate matter (PM), air toxics, and greenhouse gases in a single, integrated plan
  • Review progress in improving air quality in recent years
  • Establish emission control measures to be adopted or implemented in the 2009 -2012 timeframe

The District will be hosting an introductory workshop on the 2009 Bay Area Clean Air Plan at the MetroCenter Auditorium on July 15, 2008 from 9:00 to 11:00.  Download workshop notice.

Download July 15 workshop presentation.

 

 
graphic

Contact Information

For additional information please contact:

David Burch Principal Environmental Planner (415) 749-4641

Subscribe to the 2009 Clean Air Plan Updates email list
All fields marked * are required.

*First Name:
*Last Name:
*Email:
 

 

spacer spacer
spacer spacer spacer spacer spacer spacer
Disclaimer    Email comments