Project Name | Description | Company Name | Docket | Sub Docket | Information | State | Region |
| Application under section 7 of the Natural Gas Act for authorization to construct and operate a new underground natural gas storage and pipeline header facility to be located in Smith, Jasper, and Clarke Counties, Mississippi | Leaf River Energy Center LLC | CP08-8 | 000 | Notice of availability of environmental assessment | MS | Southeast |
| | | | | Information | | |
| | | | | Information | | |
| Application for new major hydropower license. Applicant requests that Project Nos. 2146, 82, and 618 be consolidated into one project (P-2146). The consolidated project is located on the Coosa River in the states of Alabama and Georgia. | Alabama Power Company | P-2146 | 011 | Notice of Application | AL, GA | Southeast |
| | | | | Information | | |
| Construction and operation of facilities by Kinder Morgan Illinois Pipeline LLC (KMIP) in Cook, Kankakee and Will Counties, Illinois. KMIP proposes to install approximately 3.1 miles of new 24-inch-diameter pipeline and three new meter stations. | Kinder Morgan Illinois Pipeline LLC | CP06-455 | 000 | Notice to prepare an Environmental Assessment | IL | Midwest |
| The proposed project will enable Natural to expand the capacity of its Louisiana Line system, which stretches from Compressor Station 302 in Montgomery County, Texas to the Henry Hub in Vermilion Parish, Louisiana by approximately 200,000 dekatherms per day. | Natural Gas Pipeline Company of America | CP07-3 | 000 | Order issuing certificate | LA, TX | Southeast |
| Authorization to construct, install, own, operate, and maintain certain natural gas facilities in Wyoming, Boone, and Raleigh Counties, West Virginia | Dominion Transmission, Inc. | CP07-10 | 000 | Order issuing certificate | WV, WY | Northwest Northeast |
| Operation of a new supply lateral pipeline and metering facilities, with appurtenances, to be located in Uintah and Daggett Counties, Utah. Known as the Kanda Lateral, the facilities will be comprised of approximately 123 miles of 24-inch diameter pipeline, with appurtenances, designed to transport and deliver up to 406,000 Dth per day into WIC's mainline. | Wyoming Interstate Company, Ltd | CP07-14 | 000 | Order issuing certificate | UT | Northwest |
| The proposed Cave Run Lake Dam Hydroelectric Project would be located on Licking River in Bath and Rowan Counties, Kentucky. The existing Cave Run Lake Dam is administered by the U.S. Army Corps of Engineers. | James R. Robertson | P-12809 | 000 | Order issuing preliminary permit | KY | Southeast |