Acquisition Directorate

Response Boat-Medium

RB-M and HH-65

The Coast Guard Response Boat-Medium (RB-M) Acquisition Project is the third initiative in the Response Boats 2010 strategic vision and transition plan, aimed at standardizing and revitalizing the Coast Guard’s shore-based response fleet. The RB-M will re-capitalize capabilities of the existing multi-mission 41’ Utility Boats (UTB) and multiple nonstandard boats to meet the needs of the Coast Guard.
Learn more about the RB-M

Status

The second Response Boat-Medium was accepted at Coast Guard Station Cape Disappointment on August 7, 2008.

Coming Soon

- RB-M 45603 - Expected delivery in September 2008 to Key West, Florida
- RB-M 45604 - Expected delivery in October 2008 to Milwaukee, Wisconsin
- RB-M 45605 - Expected delivery in November 2008 to New York, New York
- RB-M 45606 - Expected delivery in December 2008 to Port Aransas, Texas


Recent Milestones

 

Coast Guard Accepts Second Response Boat-Medium

Second Response Boat-Medium DeliverdCoast Guard Station Cape Disappointment accepted the Coast Guard's newest multi-mission platform, Response Boat-Medium (RB-M) CG-45602, in Ilwaco, Wash., August 7, 2008, three days after celebrating the service's 218th birthday.

Station Cape Disappointment received the boat based on the challenges posed by its heavy weather operations. The RB-M is a multi-mission boat that will operate in coastal zones, which include inshore and inland waterways and open ocean out to 50-nautical-miles. This self-righting, 45-foot all-aluminum boat with twin diesel engines and water jet propulsion will significantly enhance Station Cape Disappointment's capabilities. Read more>>

 

 

 

Information About

Acquisition Programs

Marinette Marine Corp


Resources

RB-M Fact Sheet (pdf)

Surface Fact Sheet (pdf)


RB-M Videos:

Video Icon Response Boat-Medium Overview Video

Video Icon Response Boat-Medium Acceptance Trials Video

Movie Icon Check out the Response Boat-Medium Self-Righting Video


In The News:

Coast Guard Accepts Second Response Boat-Medium

Coast Guard Tests Out New Response Boat

RB-M Project Marks First Delivery; Begins Operational Test & Evaluation Phase

Coast Guard Accepts First New Response Boat

Coast Guard Introduces News Rescue Boat at Little Creek

Coast Guard's Newest Boat Debuts Today at Station Little Creek

More news...

Last Modified 9/10/2008