skip navigation
Text Size small medium large  

skip navigation
Federal Statutes
Major Orders & Regulations
Administrative Litigation

Court Cases
New Petitions
Pending Cases
Opinions
Citations to Published Opinions
Complaints
Settlements

Accounting Matters
Alternative Dispute Resolution (ADR)
CEII/FOIA
No Fear Act
 
 


Legal Resources

Court Cases: New Petitions
    Many Commission decisions are challenged or enforced in the Federal courts. The Office of the Solicitor, OGC, has independent authority to defend the Commission in court, typically the U.S. Courts of Appeals, unless the matter goes to the U.S. Supreme Court.

    The defense normally entails preparing motions and briefs and presenting oral arguments before three-judge panels. It may also involve responding to petitions for writ of mandamus and requests to stay the underlying Commission action. At times, the Office files briefs as a "friend of the court," and in certain limited circumstances also defends the Commission or enforces its initiatives in the U.S. district courts.

    1. Petro Star Inc. v. FERC and United States of America
      No. 08-1192 (D.C. Cir. filed 5/15/2008)

      • Order affirming ALJ initial decision on valuation (specifically, processing cost adjustment) of West Coast Heavy Distillate cut of Trans Alaska Pipeline System crude oil; compliance with Opinion No. 481. BP Pipelines (Alaska) Inc., et al., 122 FERC ¶ 61,236 PDF (2008).
        FERC Docket No. OR06-10


    2. State of Washington Dept. of Ecology v. FERC
      No. 08-1191 (D.C. Cir. filed 5/15/2008)

      • Conditional license for 1 MW Makah Bay Offshore Wave Pilot Project; issuance of license prior to obtaining necessary state CZMA consistency concurrence and CWA certification. Finavera Renewables Ocean Energy, Ltd., 121 FERC ¶ 61,288 PDF (2007), order on reh'g, 122 FERC ¶ 61,248 PDF (2008).
        FERC Docket No. P-12751


    3. Norwalk Power LLC v. FERC
      No. 08-1184 (D.C. Cir. filed 5/9/2008)

      • Conditional acceptance and suspension, subject to settlement and hearing procedures, of Reliability Must Run Agreement between Norwalk and ISO New England. Norwalk Power LLC, 120 FERC ¶ 61,048 PDF (2007), reh’g denied, 122 FERC ¶ 61,273 PDF (2008).
        FERC Docket No. ER07-799, et al.


    4. Illinois Commerce Commission v. FERC
      No. 08-2124 (7th Cir. filed 5/6/2008)

      • Order addressing baseline transmission expansion projects submitted pursuant to PJM Regional Transmission Expansion Plan. PJM Interconnection, L.L.C., 119 FERC ¶ 61,067 PDF (2007), order on reh’g & compl., 122 FERC ¶ 61,217 PDF (2008).
        FERC Docket No. ER06-456, et al.


    5. Connecticut Dept. of Public Utility Control v. FERC
      No. 08-1175 (D.C. Cir. filed 5/2/2008)

      • Order on remand from Conn. Dept. v. FERC, 484 F.3d 558 (D.C. Cir. 2007); FERC jurisdiction over ISO-NE’s proposed Installed Capacity Requirements for the 2005/2006 power year. ISO New England, Inc., 122 FERC ¶ 61,144 PDF (2008), reh’g denied, 123 FERC ¶ 61,036 PDF (2008).
        FERC Docket No. ER05-715


    6. Montana Consumer Counsel v. FERC
      No. 08-71827 (9th Cir. filed 5/1/2008)

      • Rulemaking codifying and, in certain respects, modifying FERC standards for obtaining and retaining market-based rates for public utilities, at 18 CFR, Part 35, Subpart H. Market-Based Rates for Wholesale Sales of Electric Energy by Public Utilities, Order 697, 119 FERC ¶ 61,295 PDF (2007), order on reh'g and clar., 123 FERC ¶ 61,055 PDF (2008).
        FERC Docket No. RM04-7


    7. BP Energy Co. v. FERC
      No. 08-1168 (D.C. Cir. filed 4/28/2008)

      • General rate case filing by Kern River; inclusion of Master Limited Partnerships in proxy group for determining rate of return. Kern River Gas Transmission Co., Op. No. 486, 117 FERC ¶ 61,077 PDF (2006), order on reh'g, 123 FERC ¶ 61,056 PDF (2008).
        FERC Docket No. RP04-274


    8. Exxon Mobil Corp. v. FERC
      No. 08-1158 (D.C. Cir. filed 4/21/2008)

      • Order on compliance, concerning classification of facilities and availability of transmission credits. Exxon Mobil Corp. v. Entergy Services, Inc., 120 FERC ¶ 61,051 PDF (2007), reh’g denied, 122 FERC ¶ 61,168 PDF (2008).
        FERC Docket No. EL03-230


    9. Homestead Energy Resources, LLC v. FERC
      No. 08-11986 (11th Cir. filed 4/21/2008)

      • Termination of hydroelectric license for failure to commence construction of project by statutory deadline. Homestead Energy Resources, LLC, 121 FERC ¶ 61,153 PDF (2007), reh'g denied, 122 FERC ¶ 61,148 PDF (2008).
        FERC Docket No. P-7115


    10. Missouri Public Service Comm’n v. FERC
      No. 08-1160 (D.C. Cir. filed 4/21/2008)

      • Abandonment and certificate authorizations to certain natural gas pipelines reorganizing into a single FERC-regulated interstate natural gas company. Missouri Interstate Gas, LLC, et al., 119 FERC ¶ 61,074 PDF (2007), order on reh'g & compl., 122 FERC ¶ 61,136 PDF (2008).
        FERC Docket No. CP06-407, et al.


    11. Washington Gas Light Co. v. FERC
      No. 08-1157 (D.C. Cir. filed 4/18/2008)

      • Order on technical conference, concerning natural gas quality standards on Columbia’s pipeline system. Norstar Operating, LLC v. Columbia Gas Transmission Corp., et al., 118 FERC ¶ 61,221 PDF (2007), order on reh'g & compl., 122 FERC ¶ 61,163 PDF (2008).
        FERC Docket No. RP06-231, et al.


    12. Friends of the River v. FERC
      No. 08-71593 (9th Cir. filed 4/16/2008)

      • Denials of late intervention, after issuance of Environmental Assessment on proposed amendment, revising minimum flow and fishery requirements, to license for the California Aqueduct Project. California Dept. of Water Resources and the City of Los Angeles, 122 FERC ¶ 61,150 PDF (2008) (reh’g of notice denying late intervention).
        FERC Docket No. P-2426


    13. Town of Buckeye, Arizona, et al. v. FERC
      Nos. 08-1126, et al. (D.C. Cir. filed 3/24/2008)

      • Certification of Phoenix Expansion Project, authorizing expansion of Transwestern to serve suburbs of Phoenix, Arizona. Transwestern Pipeline Co., et al., 121 FERC ¶ 61,175 PDF (2007), reh’g & stay denied, 122 FERC ¶ 61,165 PDF (2008).
        FERC Docket No. CP06-459, et al.


    14. Latha Anderson, et al. v. FERC
      Nos. 08-1131, et al. (D.C. Cir. filed 3/24/2008 and later)
      • Certificate authorization to construct and operate a new interstate natural gas pipeline in Georgia and South Carolina to transport new volumes of vaporized liquefied natural gas from Elba Island LNG terminal. Southern LNG, Inc., et al., 120 FERC ¶ 61,258 PDF (2007), reh'g denied, 122 FERC ¶ 61,137 PDF (2008).
        FERC Docket No. CP06-470 to 474


    15. Cross Hudson, LLC v. FERC
      No. 08-1120 (D.C. Cir. filed 3/17/2008)
        Placement in interconnection queue for competing transmission projects to serve New York City. Hudson Transmission Partners v. New York ISO, 120 FERC ¶ 61,179 PDF (2007), reh’g denied, 122 FERC ¶ 61,024 PDF (2008).
        FERC Docket No. EL07-70


    16. SFPP, L.P. v. FERC and United States of America
      No. 08-1110 (D.C. Cir. filed 3/10/2008)
      • Order on ALJ’s initial decision on 2 issues reserved by settlement, concerning reparations to shippers. SFPP, L.P., 122 FERC ¶ 61,126 PDF (2008).
        FERC Docket No. OR92-8






Updated: June 19, 2008