The Commission issued standard procedures and a standard interconnection
agreement for the interconnection of generators larger than 20
megawatts. Read
More
The Commission is reviewing the need for technical requirements
for the interconnection of large and small wind generators and
other alternative technologies,
and the need for creating specific requirements for their interconnection
to the grid. Read More