CWPPRA Summary of Wetland Benefits for Priority List Projects
(PDF 24.5KB, 2008-08-01)

State
Number
PPL Project Name Project
Area
AAHU Acres
Created /
Restored
Acres
Protected
Total
Net
Acres
BA-48 17 Bayou Dupont Ridge Creation and Marsh Restoration 317 121 187 0 187
BS-15 17 Bohemia Mississippi River Reintroduction 5210 989 637 0 637
BS-16 17 Caernarvon Outfall Management/Lake Lery SR 16260 302 268 384 652
BA-47 17 West Pointe a la Hache Marsh Creation 352 126 203 0 203
LA-08 17 Bio-Engineered Oyster Reef Demonstration 0 0 0 0 0
LA-09 17 Sediment Containment System for Marsh Creation Demonstration 0 0 0 0 0
PO-34 16 Alligator Bend Marsh Restoration and Shoreline Protection 584 166 285 45 330
ME-24 16 Southwest Louisiana Gulf Shoreline Nourishment and Protection 1244 311 203 685 888
TE-51 16 Madison Bay Marsh Creation and Terracing 1019 242 370 2 372
TE-52 16 West Belle Pass Barrier Headland Restoration 542 180 204 95 299
TE-53 16 Enhancement of Barrier Island Vegetation Demonstration 0 0 0 0 0
BS-13 15 Bayou Lamoque Freshwater Diversion 9435 560 620 0 620
BA-42 15 Lake Hermitage Marsh Creation 1581 191 402 36 438
MR-15 15 Venice Ponds Marsh Creation and Crevasses 1944 153 494 17 511
ME-23 15 South Pecan Island Freshwater Introduction 7005 100 0 98 98
BA-40 14 Riverine Sand Mining/Scofield Island Restoration 746 229 234 0 234
BS-12 14 White Ditch Resurrection and Outfall Management 8224 107 42 147 189
BA-41 14 South Shore of The Pen Shoreline Protection and Marsh Creation 348 84 155 56 211
TV-21 14 East Marsh Island Marsh Creation 378 117 189 0 189
MR-14 13 Spanish Pass Diversion 1580 79 335 98 433
TE-50 13 Whiskey Island Back Barrier Marsh Creation 1038 292 272 0 272
PO-33 13 Goose Point/Pointe Platte Marsh Creation 1384 297 424 12 436
TV-20 13 Bayou Sale Shoreline Protection 370 153 116 213 329
LA-06 13 Shoreline Protection Foundation Improvements Demonstration 0 0 0 0 0
ME-22 12 South White Lake Shoreline Protection 5473 253 157 687 844
TE-49 12 Avoca Island Diversion and Land Building 7233 132 120 23 143
BA-39 12 Mississippi River Sediment Delivery System - Bayou Dupont 471 159 326 0 326
PO-32 12 Lake Borgne and MRGO Shoreline Protection 465 70 17 249 266
LA-05 12 Floating Marsh Creation Demonstration 0 0 0 0 0
MR-12 12 Mississippi River Sediment Trap 1920 508 1190 0 1190
ME-21b 11 Grand Lake Shoreline Protection, O&M Only [CIAP]          
BA-38 11 Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration 1117 287 334 0 334
PO-31 11 Lake Borgne Shoreline Protection at Bayou Dupre 98 28.89 27 56 83
BA-27d 11 Barataria Basin Landbridge Shoreline Protection, Phase 4 589 93 0 256 256
BA-36 11 Dedicated Dredging on the Barataria Basin Landbridge 504 135 242 0 242
BA-37 11 Little Lake Shoreline Protection/Dedicated Dredging near Round Lake 1373 348.57 409 304 713
BA-35 11 Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 596 208 253 10 263
TE-46 11 West Lake Boudreaux Shoreline Protection and Marsh Creation 1207 129 157 120 277
TE-47 11 Ship Shoal: Whiskey West Flank Restoration 1249 269 195 0 195
TE-48 11 Raccoon Island Shoreline Protection/Marsh Creation 0 0 167 0 167
ME-21a 11 Grand Lake Shoreline Protection, Tebo Point 1239 153 40 490 530
ME-20 11 South Grand Chenier Hydrologic Restoration 7496 322.17 370 70 440
LA-03b 11 Coastwide Nutria Control Program 46760 2992.85 0 14963 14963
CS-31 11 Holly Beach Sand Management 8901 370 0 330 330
PO-29 11 River Reintroduction into Maurepas Swamp 36121 8486 0 5438 5438
BS-10 10 Delta Building Diversion North of Fort St. Phillip 2254 157 501 0 501
MR-13 10 Benneys Bay Diversion 21518 1426 5426 280 5706
BA-34 10 Mississippi River Reintroduction Into Northwest Barataria Basin 5134 781 0 941 941
CS-32 10 East Sabine Lake Hydrologic Restoration 6589 219 90 135 225
BS-11 10 Delta Management at Fort St. Phillip 1305 77 267 0 267
TE-44 10 North Lake Mechant Landbridge Restoration 7571 367 408 196 604
BA-33 10 Delta Building Diversion at Myrtle Grove 416563 5797 2675 6216 8891
PO-30 10 Lake Borgne Shoreline Protection 192 61 0 165 165
TE-43 10 GIWW Bank Restoration of Critical Areas in Terrebonne 3324 183 32 334 366
ME-19 10 Grand-White Lakes Landbridge Protection 1530 38 52 161 213
ME-18 10 Rockefeller Refuge Gulf Shoreline Stabilization 1373 344 57 863 920
TE-45 10 Terrebonne Bay Shore Protection Demonstration 0 0 0    
TE-41 9 Mandalay Bank Protection Demonstration 0 0 0 0 0
MR-11 9 Periodic Introduction of Sediment and Nutrients at Selected Diversion Sites Demonstration 0 0 0 0 0
PO-26 9 Opportunistic Use of the Bonnet Carre Spillway 13583 121 0 177 177
PO-27 9 Chandeleur Islands Marsh Restoration 504 194 220 0 220
ME-16 9 Freshwater Introduction South of Highway 82 19988 553 53 243 296
TE-39 9 South Lake De Cade Freshwater Introduction 6785 102 0 201 201
TV-18 9 Four Mile Canal Terracing and Sediment Trapping 1214 51 133 34 167
AT-04 9 Castille Pass Channel Sediment Delivery 5368 256 577 0 577
CS-29 9 Black Bayou Culverts Hydrologic Restoration 72378 162 375 165 540
CS-30 9 GIWW - Perry Ridge West Bank Stabilization 1132 40 42 41 83
TV-11b 9 Freshwater Bayou Bank Stabilization - Belle Isle Canal to Lock 285 75 44 197 241
ME-17 9 Little Pecan Bayou Hydrologic Restoration 13544 210 0 56 56
BA-27c 9 Barataria Basin Landbridge Shoreline Protection, Phase 3 2380 101 0 264 264
PO-28 9 LaBranche Wetlands Terracing, Planting, and Shoreline Protection 4505 198 374 115 489
BA-29 9 LA Highway 1 Marsh Creation (Deauthorized) 163 86 146 0 146
BA-30 9 East/West Grand Terre Islands Restoration 683 269 335 0 335
TE-40 9 Timbalier Island Dune and Marsh Creation 663 124 161 112 273
TE-37 9 New Cut Dune and Marsh Restoration 386 43 27 75 102
TV-19 9 Weeks Bay Marsh Creation and Shore Protection/Commercial Canal Freshwater Redirection 0 0 211 67 278
PO-24 8 Hopedale Hydrologic Restoration 3805 269 0 134 134
ME-11 8 Humble Canal Hydrologic Restoration 4030 297 313 65 378
CS-28-1 8 Sabine Refuge Marsh Creation Cycle 1 0 0 214 0 214
PO-25 8 Bayou Bienvenue Pump Station Diversion and Terracing (Deauthorized) 2661 203 415 27 442
TV-17 8 Lake Portage Land Bridge 1496 9 5 19 24
BS-09 8 Upper Oak River Freshwater Siphon, Phase 1 (Deauthorized) 4618 153 270 69 339
CS-28-2 8 Sabine Refuge Marsh Creation, Cycle 2 0 0 184 77 261
CS-28-3 8 Sabine Refuge Marsh Creation Cycle 3 0 0 187 0 187
CS-28-4 8 Sabine Refuge Marsh Creation, Cycle 4 0 0 163 0 163
CS-28-5 8 Sabine Refuge Marsh Creation, Cycle 5 0 0 168 0 168
TE-36 7 Thin Mat Floating Marsh Enhancement Demonstration 0 0 0 0 0
BA-27 7 Barataria Basin Landbridge Shoreline Protection, Phases 1 and 2 2618 464 0 1304 1304
ME-14 7 Pecan Island Terracing 3550 143 383 59 442
BA-28 7 Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island 297 73 100 27 127
CS-27 6 Black Bayou Hydrologic Restoration 25529 2812 2960 634 3594
MR-09 6 Delta Wide Crevasses 5210 927 2298 88 2386
TV-14 6 Marsh Island Hydrologic Restoration 6697 452 41 367 408
TE-34 6 Penchant Basin Natural Resources Plan, Increment 1 80719 521 35 640 675
TV-15 6 Sediment Trapping at "The Jaws" 2782 754 1837 162 1999
TE-32a 6 North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 9604 900 0 416 416
BA-26 6 Barataria Bay Waterway East Side Shoreline Protection 2790 128 0 217 217
TV-13a 6 Oaks/Avery Canal Hydrologic Restoration, Increment 1 3348 192 0 160 160
TV-16 6 Cheniere Au Tigre Sediment Trapping Demonstration 0 0 0 0 0
MR-10 6 Dustpan Maintenance Dredging Operations for Marsh Creation in the Mississippi River Delta Demonstration 0 0 0 0 0
LA-03a 6 Nutria Harvest for Wetland Restoration Demonstration 0 0 0 0 0
TE-33 6 Bayou Boeuf Pump Station (Deauthorized) 218000 1457 0 0 0
TE-35 6 Marsh Creation East of the Atchafalaya River � Avoca Island (Deauthorized) 2000 355 434 0 434
TE-29 5 Raccoon Island Breakwaters Demonstration 0 0 0 0 0
BA-03c 5 Naomi Outfall Management 26603 379 0 633 633
TV-12 5 Little Vermilion Bay Sediment Trapping 964 149 390 51 441
TE-10 5 Grand Bayou Hydrologic Restoration 16164 165 0 199 199
BA-24 5 Myrtle Grove Siphon 15894 527 0 1119 1119
PO-22 5 Bayou Chevee Shoreline Protection 212 42 0 75 75
CS-11b 5 Sweet Lake/Willow Lake Hydrologic Restoration 5796 261 58 189 247
ME-13 5 Freshwater Bayou Bank Stabilization 1724 248 0 511 511
BA-25b 5 Mississippi River Reintroduction Into Bayou Lafourche 85094 705 0 988 988
CS-24 4 Perry Ridge Shore Protection 5945 624 14 1189 1203
BA-22 4 Bayou L'Ours Ridge Hydrologic Restoration (Deauthorized) 24765 467 0 737 737
BA-23 4 Barataria Bay Waterway West Side Shoreline Protection 1789 63 0 232 232
TE-30 4 East Timbalier Island Sediment Restoration, Phase 2 9330 140 61 154 215
CS-25 4 Plowed Terraces Demonstration 0 0 0 0 0
MR-08 4 Beneficial Use of Hopper Dredged Material Demonstration (Deauthorized) 0 0 0 0 0
CS-26 4 Compost Demonstration (Deauthorized) 0 0 0 0 0
PO-21 4 Eden Isles East Marsh Restoration (Deauthorized) 2536 1253 1454 0 1454
TE-31 4 Flotant Marsh Fencing Demonstration (Deauthorized) 0 0 0 0 0
BS-07 4 Grand Bay Crevasse (Deauthorized) 6300 257 240 394 634
MR-07 3 Pass-a-Loutre Crevasse (Deauthorized) 1869 455 1043 0 1043
PO-20 3 Red Mud Demonstration (Deauthorized) 0 0 0 0 0
ME-12 3 Southwest Shore White Lake Demonstration (Deauthorized) 0 0 0 0 0
PO-09a 3 Violet Freshwater Distribution (Deauthorized) 17980 38 40 207 247
BS-04a 3 White's Ditch Outfall Management (Deauthorized) 5249 68 0 37 37
BA-21 3 Bayou Perot/Bayou Rigolettes Marsh Restoration (Deauthorized) 4255 498 0 1065 1065
BA-15 3 Lake Salvador Shore Protection Demonstration 0 0 0 0 0
BA-04c 3 West Pointe a la Hache Outfall Management 15755 1652 0 646 646
PO-19 3 Mississippi River Gulf Outlet (MRGO) Disposal Area Marsh Protection 855 435 0 755 755
MR-06 3 Channel Armor Gap Crevasse 2097 234 611 325 936
CS-04a 3 Cameron-Creole Maintenance 54076 454 1140 1462 2602
TV-04 3 Cote Blanche Hydrologic Restoration 30000 1200 0 2223 2223
TE-25 3 East Timbalier Island Sediment Restoration, Phase 1 45102 319 37 1876 1913
TE-27 3 Whiskey Island Restoration 4926 549 447 792 1239
CS-23 3 Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully 42247 491 367 586 953
TE-26 3 Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island 13024 468 194 315 509
TE-28 3 Brady Canal Hydrologic Restoration 7653 337 0 297 297
AT-02 2 Atchafalaya Sediment Delivery 4248 777 2200 32 2232
PO-18 2 Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 5475 584 750 530 1280
CS-22 2 Clear Marais Bank Protection 4637 909 38 1029 1067
CS-20 2 East Mud Lake Marsh Management 8054 487 0 1520 1520
ME-04 2 Freshwater Bayou Wetland Protection 14381 1611 0 1593 1593
PO-06 2 Fritchie Marsh Restoration 5924 201 0 1040 1040
AT-03 2 Big Island Mining 3400 467 1200 360 1560
BS-03a 2 Caernarvon Diversion Outfall Management 15556 504 802 0 802
TV-09 2 Boston Canal/Vermilion Bay Bank Protection 466 78 0 378 378
TE-22 2 Point Au Fer Canal Plugs 5230 158 0 375 375
CS-21 2 Highway 384 Hydrologic Restoration 650 51 0 150 150
TE-23 2 West Belle Pass Headland Restoration 2459 216 162 312 474
BA-20 2 Jonathan Davis Wetland Restoration 7199 485 0 510 510
CS-09 2 Brown Lake Hydrologic Restoration 2197 2 152 10 162
TE-24 2 Isles Dernieres Restoration Trinity Island 776 120 49 60 109
BA-02 1 GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration 14948 885 0 175 175
CS-17 1 Cameron Creole Plugs 20392 242 865 0 865
PO-16 1 Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 3800 520 1050 500 1550
CS-18 1 Sabine National Wildlife Refuge Erosion Protection 13000 1655 0 5542 5542
MR-03 1 West Bay Sediment Diversion 12910 4912 9831 0 9831
BA-19 1 Barataria Bay Waterway Wetland Restoration 510 151 445 0 445
PO-17 1 Bayou LaBranche Wetland Creation 487 191 203 0 203
ME-09 1 Cameron Prairie National Wildlife Refuge Shoreline Protection 640 38 0 247 247
TE-20 1 Isles Dernieres Restoration East Island 449 45 9 0 9
TV-03 1 Vermilion River Cutoff Bank Protection 202 23 11 54 65
TE-18 1 Timbalier Island Planting Demonstration 0 0 0 0 0
CS-19 1 West Hackberry Vegetative Planting Demonstration 0 0 0 0 0
TE-17 1 Falgout Canal Planting Demonstration 0 0 0 0 0
ME-08 1 Dewitt-Rollover Vegetative Plantings Demonstration (Deauthorized) 0 0 0 0 0
TE-19 1 Lower Bayou LaCache Hydrologic Restoration (Deauthorized) 4200 134 0 86 86
BA-18 1 Fourchon Hydrologic Restoration (Deauthorized) 2020 644 44 106 150
CRMS Coastwide Reference Monitoring System          
SRAF Storm Recovery Assessment Fund          

172 assessments listed

PPL - Priority Project List

Project Area - the benefitted area as determined by the Environmental Work Group for purposes of conducting Wetland Value Assessments.

AAHU - Average Annual Habitat Units as determined by the Environmental Work Group.

Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

Acres Created/Restored - The acres of emergent marsh created or restored as a result of project implementation.

Acres Protected - The acres of emergent marsh protected from loss as a result of project implementation.

Total Net Acres - The net gain in emergent marsh as a result of project implementation as determined by the Environmental Work Group. This figure includes acres of emergent marsh protected, created, and restored as a result of project implementation.