PCR Number | Product | Start Day(s) | Short Description |
---|---|---|---|
PCR06-010 | Land Cover Change Intermediate (MOD44CQ, MOD44CH, MOD44CT) | C5 Reprocessing | Update to internal water and land detection |
PCR06-011 | L3 8-day Snow Cover (MOD10A2) | C5 Reprocessing C5 Forward Processing | Fix for incorrect labeling of snow/ice covered lake as land during winter |
PCR06-012 | L3 16-day BRDF (MCD43) | C5 Reprocessing | Fix to accept the all the input L2G in 1-layer only format |
PCR06-013 | L2 Land Surface Reflectance (MOD09) | C5 Reprocessing | Fix to correct the flagging of QA bit indicating the status of atmospheric correction |
PCR06-014 | L3 16-day VI (MOD13) | Terra C5 Reprocessing 2000065 (3/5/2000) | Patch to bypass LSR with large Solar Zenith Angle (SZA > 85) and fix for VI qa flags |
PCR06-015 | L2 Daily Land Surface Reflectance (MOD09) | C5 Reprocessing | Fix to correct the retrieved reflectance over ocean and inland water area |
PCR06-017 | L4 Daily Land Surface Reflectance CMG (MOD09CMG) | Terra C5 Reprocessing 2000160 (6/8/2000) | Fix to ingest the correct orbits into the daily CMG |
PCR06-018 | L3 Daily Land Surface Temperature (MOD11A1 MOD11B1) | Terra C5 Reprocessing 2000076 (3/16/2000) | Fix to retrieve the missing emissive band data |
PCR06-019 | L2 Daily Snow Cover (MOD10_L2) | Terra C5 Reprocessing 2000306 (11/1/2000) | Disable shadowed land screen to improve accuracy of snow map over boreal forest |
PCR06-020 | L3 16-day BRDF(MCD43) | C5 Reprocessing | Update to process deep inland water area |
PCR06-021 | L3 Monthly Burned Area (MCD45A1) | Terra C5 Reprocessing 2000049 | Introducing the new product |
PCR06-023 | L3 16-day BRDF (MCD43) | Terra C5 Reprocessing 2000312 | Fix a bug resulting in more cases of zero values for two of three albedo parameters. |
PCR06-024 | L2 Daily Snow and SeaIce (MYD10 and MYD29) | Aqua C5 Forward Processing 2007001 | Aqua version of C5 from Aqua C4, includes only minor metadata changes |
PCR06-025 | L3 LAI/FPAR (MCD15, MOD15) | Terra C5 Reprocessing 2001001 Terra and Aqua C5 forward processing 2007001 | Include 4-day and 8-day combined product |
PCR07-001 | L2 Daily Land Surface Reflectance (MOD09) | C5 Reprocessing C5 Forward processing | Flag dead and noisy detectors in band 5 and 6 of Aqua and the detector 3 in band 5 of Terra. |
PCR07-002 | L2 Daily Land Surface Reflectance (MOD09) | C5 Reprocessing C5 Forward processing | Fix to label noisy detectors in Terra |
PCR07-003 | L2G Daily Land Surface Reflectance | TBU | Fix to correct shift in Aqua band 5-7 with respect to bands 1-4 |
PCR07-004 | L3 Monthly Burned Area (MCD45A1) | TBU | Production rule change to correct problem at year-boundary |
PCR07-005 | L3 Daily Land Surface Temparature | C5 Aqua and Terra forward processing 2007001 | Update the production perl script to use the Terra and Aqua interim files. |
PCR07-006 | L3 8-day Surface Reflectance (MOD09A1) | TBU | Remove the supplemental aerosol and snow/cloud test in the compostie |
PCR07-007 | L3 Monthly 1km VI (MOD13A2) | TBU | Fix the production rule to correct the start and end time of the month being processed. |
PCR07-008 | L3 Monthly 1km VI (MOD13C1) | Terra C5 reprocessing 2001001 Terra C5 forward processing 2007001 | Fix the production rule to correct the Terra beginning of year in the loader module. |
PCR07-009 | L2 Daily Land Surface Reflectance (MOD09) | C5 Reprocessing C5 Forward processing | Implement the dead detector labeling for 250m bands |
PCR07-010 | L2 Daily Land Surface Reflectance Intermediate (MOD09IDS) | TBU | Fix bugs in routines writing the QA information for the MOD09 Intermediate Products |
PCR07-011 | Land Cover Change Intermediate (MOD44CQ, MOD44CH, MOD44CT) | TBU | Improve runtime memory usage, update a quality flag and minor change in composite criteria. |
PCR07-012 | L2 Land Surface Reflectance (MOD09) | TBU | Bug fix affecting atmospheric correction flag, initializing variables, square root of negative numbers. |
PCR07-013 | L3 Daily Land Surface Temparature | C5 Aqua and Terra reprocessing 2002185 | Bug fix in source code addressing the problem of missing LST_Day_6km or LST_Night_6km and emis bands 20 -29 at some grids in MOD11B1/MYD11B1. |