Link back to NH/Vt home page

LAKE CHAMPLAIN BASIN BMP:

URBAN ENVIRONMENT, ENGLESBY BROOK

In 1999, the 0.93-square-mile Englesby Brook watershed in Burlington and South Burlington, VT, draining directly into Lake Champlain, was selected for the urban BMP-effectiveness study. Funds for BMP implementation activities in the Englesby Brook watershed were made available to the City of Burlington as part of the Pine Street Barge Canal superfund settlement. The Englesby remediation plan (Center for Watershed Protection, written communication, 2000) includes BMPs to address erosion control, stormwater treatment, source reduction and education. Structural BMPs and educational/outreach activities that have been implemented in the Englesby Brook watershed are listed below.

Map showing land use and monitoring station in Englesby Brook watershed
click to enlarge location map

Structural BMPs

  • Golf course irrigation pond near headwaters (2002)
  • Stormwater detention facility to treat 100 acres in Shelburne Road area of Burlington (2005)
  • Shallow marsh wetland to treat 38 acres in Richardson Street area of Burlington (2005)

Educational and outreach activities

  • UVM Watershed Alliance (managed by Lake Champlain Sea Grant), with a goal of increasing Burlington area middle school students' understanding of watersheds and water quality, has focused awareness on Englesby Brook as a watershed having symptoms of stream degradation due to urbanization.
  • UVM Extension produced an Englesby Brook newsletter, organized watershed residents to weigh in on the restoration plans, used the Master Gardeners program to promote low input and organic gardening practices, and created Champlain Community Garden on the banks of Englesby Brook.

 

USGS MONITORING OF ENGLESBY BROOK

Photo: Community Garden at the Champlain Elementary School in Englesby Brook Watershed
Photo: Weir at Englesby Brook
Photo: Stormwater detention facility in Englesby Brook watershed

Community Garden at the Champlain
Elementary School in the Englesby
Brook Watershed (Click to enlarge)

Weir and weir pool at Englesby
Brook. (Click to enlarge)
Stormwater detention facility in the Englesby
Brook watershed (Click to enlarge)


USGS monitoring focuses on the composite effects of BMPs in the watershed on the water quality of Englesby Brook. Listed below are the essential components of the study plan and links to data:

blue arrow bullet Streamflow. A streamflow gaging station was constructed in 1999. The gage includes a v-notch sharp-crested weir and a continuous data logger that transmits data in real time via satellite to USGS computers and to the public.

blue arrow bullet Single sampling station near the Brook outlet.

blue arrow bullet Statistical and graphical analyses to determine whether there are differences in sediment and phosphorus loads for the periods before versus after BMP implementation (these results will be available in a 2007 USGS Scientific Investigations Report).

blue arrow bullet Links to Englesby Brook streamflow data in the USGS National Water Information System (NWIS) database:

blue arrow bullet Links to Englesby Brook water-quality data, including Nitrogen, Phosphorus, and suspended sediment, October 1999 through September 2007:

 


REFERENCE

University of Vermont Spatial Analysis Lab, 2005, 2002 Land cover/land use dataset for Vermont: Accessed August 3, 2006, at http://www.vcgi.org/dataware/default.cfm?layer=LCLU2002

 

U.S. Department of the Interior
U.S. Geological Survey
New Hampshire/Vermont Water Science Center, USGS, 361 Commerce Way, Pembroke, NH 03275, USA
Comments and feedback: NH/VT webmaster-nh@usgs.gov
Last Updated November 26, 2007
Privacy Statement || Disclaimer