This is the High Flux Isotope Reactor Operations Status and Forecast Report as of 15:00 on Monday, September 8, 2008.

The reactor was shutdown at 10:46 for cycle 416 on Wednesday, August 6, 2008.

Startup for Cycle 417 is estimated to be Wednesday, September 24.

HFIR Short Term Operating Forecast (pdf)
HFIR Run Schedule (pdf)
HFIR User List (pdf)
FY 2008 HFIR Planning Schedule (pdf)
FY 2009 HFIR Planning Schedule (pdf)