DSN - APL PRODUCT SUBMISSION

PRINT PAGE Add This

The JITC is the Department of Defense's (DoD) facility for evaluating the interoperability and information assurance of National Security Systems (NSS) and Information Technology (IT) systems.

JITC is the sole DoD joint interoperability certification and information assurance authority per the Chairman Joint Chiefs of Staff Instruction 6212.01 B. and DoD Instruction 8100.3.

JITC RESPONSIBILITY

The JITC conducts testing of information, communications, and intelligence hardware and software systems and components to ensure products meet requirements as mandated by DoD regulations.

Tests Conducted for DSN Compliance:

Information Assurance Testing (IA) - As mandated by DoDI 8100.3 and DoDD 8500.1

Interoperability Testing (IO) - As mandated by CJCSI 6212.01B and DoDD 4630.5

APPLICANT Responsibility

The Applicant is required to adhere to the following requirements listed below. Neither JIC nor IA testing will be conducted on the submitted solution without ongoing compliance with the following requirements. Please check the boxes indicating your acceptance to comply.

  1. Applicant responsible for coordinating payment of lab testing fees/CRADA agreements with Action Officer that will contact applicant upon acceptance of completed test submittal and release of solution Tracking Number.

  2. Download APL Test Bundle.  Review bundle and submit documentation IAW the APL Documentation Guide which is included in the APL Test Bundle. Upon receipt of all required documentation a testing Tracking Number will be issued for the solution initiating testing process.

  3. Apply applicable Security Technical Implementation Guide (STIGS) requirements to the submitted product and submit results to UCCO 2 weeks prior to scheduled testing at following location:

    ATTN: UCCO Product Documentation
    Oberon Associates, Inc.
    9700 Capital Court, Suite 301
    Manassas, Va 20110
    Email: vcao@vcao.org

  4. Applicant (ie: either vendor or sponsor) ensures on-site engineering support be provided during all phase of APL testing assigned for the solution under test.  TSSI test scheduled is located at the following link: TSSI Testing Schedule

  5.   Applicant concurs with right of UCCO to make final determination of IA testing location based upon schedule load balancing and available testing resources.  

Please download and review the UC APL Testing Process briefing and review prior to submitting for testing.

For further guidance, contact the UCCO


I have read and acknowledge submission requirements. Please provide your email address and then click "I Agree".

Email address:

*Note: Click here for retest or submittal update