Insp. Comment |
Inspection/Violation Comments |
ACTION |
INSTALL WELL SIGNS TO INFORM OF WELLS PRODUCING INTO BATTERY, (2ND NOTICE) REPAIR BERMS TO CONTAIN 300BBL PLUS PRECIPITATION, REMOVE AND REMEDIATE OILY SOIL IN BERMS AND END OF LOAD LINE, INSTALL SPILL CONTAINERS AT LOAD LINE. |
FIREWALL |
INADEQUATE EARTHEN BERMS |
GENHOUSE |
GOOD |
MISC |
PUMPING UNIT W/ELEC MOTOR,ELEC PANEL,ROTO PHASE AT REA POLE WITH CEMENT SLAB AND CATHOTIC RECTIFIER, 4 DEADMEN |
SPILCOM |
SOME OIL IN BERMS, OILY SOIL IN 50% OF TANK PAD, OILY SOIL AT END OF LOAD LINES. |
SURFRH |
UNUSED AREAS OF THE LOCATION ARE PASTURE |
TANKBAT |
2-300BBL SPT, 1-300BBL FGT, VHT, HHT, ELEC PANEL @REA POLE WITH CATHOTIC RECTIFIER,PROPANE TANK, CENTRAL BATTERY FOR CHAMPLIN 205 AMOCO A-2, A-4, A-5. 1630` S |
WELLSIGN |
SIGN AND LABELING PRESENT, SIGN DOES NOT INFORM OF WELLS PRODUCING INTO BATTERY. |
.