Sanitary Sewer System Rehabilitation Project
manhole rehab.jpg

Project Information
A three year Sanitary Sewer Evaluation Study was conducted by RJN from FY2008 to FY2010.  The final report from the SSES recommended the rehabilitation of 358 sewer manholes including replacing manhole rings/lids, corbel, invert, clean-out, and point repairs, as well as street and pavement repairs resulting from activities associated with conducting the manhole repairs.  These repairs were recommended in order to prevent Inflow and Infiltration of stormwater and ground water which should lower the City's treatment costs to TRA.  This project will be completed over three fiscal years.

Project Details
Engineering Consultant:
RJN
Contractor:
City of Southlake Wastewater Utility Division
Budget:
  • Yr. 1 (FY 2012)                 - $100,000
  • Yr. 2 (FY 2013)                 - $250,000
  • Yr. 3 (FY 2014)                 - $250,000
                              Total - $600,000
Construction Start Date:
2012
Anticipated Completion Date:
2015
Staff Contact:
Jack Thompson
Title:
Wastewater Supervisor
Phone Number:
(817) 748-8082