8-inch Water Line connector from Lake Dr/Burney Ln to Palo Duro/Lonesome Dove
Water Line Connector at Lake Dr.-Burney Ln.

Project Information
This project involves funding to connect an 8-inch water line at Lake Dr. and Burney Ln. to the existing 6-inch waterline at Palo Duro and Lonesome Dove by installing 1600 feet of 8-inch PVC.  The new line will provide increased water pressure and flow, and will establish a loop for fire protection to the Dove Estates Subdivision.   

Project Details
Engineering Consultant: MLA Consulting
Construction Contractor:     TBD
Budget: $350,000
Construction Start Date: 2014
Anticipated Completion Date: 2014
Southlake 2030 Comprehensive Master Plan Item:  T2-13
Status: An engineering design contract with MLA Consulting was approved at the November 6, 2012 City Council meeting.
Staff Contact: Alex Ayala, P.E.
Title: Civil Engineer
Phone Number: (817) 748-8274

For a more detailed description of this project, please see the "Public Works Capital Projects Update" quarterly report. 