Project Information
This project will implement paving and drainage improvements to N. White Chapel Blvd. from Emerald St. north to SH114.
N. White Chapel Blvd. will be widened to its ultimate pavement section of a 4 lane divided highway with a median. The median along this section of N. White Chapel Blvd. will include landscaping and irrigation. The intersection of N. White Chapel Blvd. at Highland St. will be improved from a four-way stop sign intersection to a dual-lane roundabout to accommodate increased traffic along this corridor. A conceptual drawing of the dual-lane roundabout is illustrated in the slideshow above along with cross sections of the future roadway, landscaped median, striped bike lane and sidewalks.  

Project Details
Engineering Consultants:
Huitt Zollars and Nathan D. Maier
Construction Contractor:
TBD
Budget:
$ 10,380,000 (includes a $2,185,000 match from Tarrant County)
Construction Start Date:
TBD (Construction may occur in phases).
Utility relocation anticipated to begin early 2015.
Anticipated Completion Date:
TBD
Status: Engineering is in progress and plans are 95% complete
Southlake 2030 Comprehensive
Master Plan Item
:
This project has been identified as a Southlake 2030 Tier I Mobility Master Plan recommendation, reference Central Sector M1 & SH114 Sector M2. 
Citizen Survey Focus Area: This project will address the Citizen Satisfaction Survey focus area of managing traffic congestion. 
Staff Contact:
Steve Anderson, P.E., C.F.M
Title:
Civil Engineer
Phone Number:
(817) 748-8101


Related Articles



For further information on this project, please see the "Public Works Capital Projects" quarterly report. 

Return to the Active City Construction Projects page.