Our GovernmentOur CommunityDoing BusinessI Want To


Go To Search
HomePrintEmail
Water, Wastewater & Stormwater Master Plan
Welcome to the Water, Wastewater & Stormwater Master Plan webpage of the Southlake 2030 Comprehensive Plan update. The City of Southlake contracted with Neel-Schaffer/Cheatham & Associates to develop the Water, Wastewater & Stormwater Master Plan update. Neel-Schaffer/Cheatham & Associates utilized existing documents such as previous plans, system maps and construction documents as a basis for the Water, Wastewater & Stormwater System Master Plan update. Neel-Schaffer/Cheatham & Associates also met with Southlake officials, staff and performed limited site visits to verify data and better understand the priorities of the City of Southlake. Existing population and growth data from the North Central Texas Council of Government (NCTCOG) were also used, along with data from previous engineering studies, reports and designs performed for the City.

The Water, Wastewater, Stormwater Master Plan Committee was made up of the following members:

 Planning & Zoning Commission Members Robert Hudson
Michael Springer
Michael Forman
 Ex-Officio Mayor John Terrell
 City Council Members Martin Schelling
Vacant
 

Water Master Plan
The Water Master Plan was approved by City Council on June 5, 2012. A copy of this plan can be found below.

Wastewater Master Plan
The Water Master Plan was approved by City Council on August 7, 2012. A copy of this plan can be found below.


Stormwater Master Plan
The Water Master Plan was approved by City Council on September 4, 2012. A copy of this plan can be found below.



Planning & GIS
1400 Main St., Suite 310
Southlake, TX 76092
Ph: (817) 748-8621
Fx: (817) 748-8077

Building Inspections &
Code Enforcement

1400 Main St., Suite 250
Southlake, TX 76092
Ph: (817) 748-8236
Ph: (817) 748-8237
Fx: (817) 748-8241

Inspection Requests
Ph: (817) 748-8214

Code Enforcement Hotline
Ph: (817) 748-8654
Info Advanced