Insp. Comment |
Inspection/Violation Comments |
ACTION |
ASSESS CRUDE SPILLAGE AT OPEN-TOP TANK AND VERIFY TANK INTEGRITY. REPAIR TANK IF NECESSARY - CLEANUP SPILLAGE IN ACCORDANCE W/ COGCC RULES. LABEL ALL TANKS IN ACCORDANCE WITH RULE 210.D.
|
FIREWALL |
GOOD
|
GENHOUSE |
GOOD. WEEDS RECENTLY MOWED. BIRD CONES INTACT.
|
MISC |
ALL TANKS NEED LABELING PER RULE 210.D W/ CONTENTS, VOLUME, NFPA SIGNAGE.
|
SPILCOM |
OPEN-TOP PARTIALLY BURIED CRUDE TANK APPEARS TO BE LEAKING INTO SECONDARY CONTAINMENT. CONTAINED W/IN CONTAINMENT AT THIS TIME. NEED TO VERIFY TANK INTEGRITY AND REPAIR/CLEANUP TANK/SPILL.
|
SURFRH |
GOOD. |
TANKBAT |
WH, HORZ SEP, MTR SHED, X2 400 BBL AST (PW & CRUDE?), X1 OPEN TOP TANK W/ CRUDE (STEEL W/ PLASTIC LINER) |
.