- Restore and protect creek banks
- Encourage creek bank "No Mow" zones
- Improve fish habitat
- Secure & Stock additional trout for fishing
- Conduct Work Shops pertaining to the
Watershed
- Annual creek clean ups
- Monitor stream water quality monthly
- Conduct Youth Trout Derby
The Little Shamokin Creek watershed
covers approximately 37 square miles & is
a sub watershed of Shamokin Creek.
Originating in Northumberland County to
include 4 municipalities (Rockefeller,
Shamokin, Upper & Lower Augusta
townships). Little Shamokin Creek is
designated for protection of Cold Water
Fishes (CWF). The Little Shamokin Creek
watershed is largely forested, 65%, with
tree farms and deciduous stands.
Agricultural areas of mostly pastures
and croplands make up an additional 30%
of the watershed & urban/developed
lands, 2%.
Location of Watershed
LSCWA Serving the Watershed Community
To Provide Education & Resources:
A watershed is a land area in which water drains
into a body of water like a lake, river or stream. A
watershed consists of both the water body & the
land which drains into that body of water. This
drainage basin collects all of the precipitation as it
either runs off the land or percolates through the
soil before reentering the stream.
So What Is A Watershed?
Before
After
Everyone lives in a watershed!
Click on pictures
for enlargement
441 Plum Creek Road Sunbury, PA 17801
570 495-4665 Ext 306
Little Shamokin Creek Watershed Association
Click on map to enlarge
Little Shamokin Creek
Watershed Association
Website Sponsor:
Logo by
THE LONG CENTER FOR ENVIRONMENTAL STEWARDSHIP AND EDUCATION
On April 19, 2014 a youth trout derby was held at the Long Center. 250 youth from the area participated. Each youth was given a fishing related gift, a commemorative lapel pin, food and beverage. There was no fee for the youth.
The Sunbury Eagles #503 sponsored an Earth Day event at the Long Center on April 26, 2014. At this event 2 more restoration 1.0 and 6 Chinkapin/American cross chestnut seeds were planted and mulched. In addition, our 16 other American chestnut trees were mulched. 4 apple tree seedlings were also planted.
We have entered into a contract for a 24' x 60' picnic pavilion. Construction is scheduled to start the week of April 28, 2014.
View Event Photos
UPCOMMING EVENTS April 30: Creek Water Testing May 28: Monthly Meeting June 14: Rain Barrel Workshop June 25: Creek Water Testing June 25: Monthly Meeting
|
This site does not track visitor information